IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,477

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0111 # 05 Y:2001 05 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $11,959 $0 Implemented
SU0111 # 07 Y:2001 07 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $3,135 $0 Implemented
BD0195 # 08 Y:2001 08 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $838 $400 Implemented
SU0104 # 01 Y:2001 01 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $92 $0 Implemented
SU0104 # 02 Y:2001 02 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $147 $0 Implemented
SU0104 # 03 Y:2001 03 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,030 $4,460 Implemented
LM0015 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,371 $19,200 Implemented
LM0015 # 02 Y:2001 02 2001 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $5,951 $550 Implemented
LM0015 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,264 $800 Implemented
LM0015 # 07 Y:2001 07 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $8,944 $11,800 Implemented
LM0015 # 09 Y:2001 09 2001 CONTRACT OUT MAINTENANCE $7,300 $0 Implemented
LM0015 # 10 Y:2001 10 2001 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $104,000 $24,000 Implemented
IC0010 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,637 $8,900 Implemented
IC0010 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $2,511 $4,312 Implemented
IC0010 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $552 $1,250 Implemented
IC0010 # 07 Y:2001 07 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $45,000 $9,500 Implemented
IC0006 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,018 $5,950 Implemented
IC0006 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,974 $29,136 Implemented
IC0006 # 04 Y:2001 04 2001 INSTALL OCCUPANCY SENSORS $2,411 $3,500 Implemented
IC0006 # 05 Y:2001 05 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,570 $10,600 Implemented
IC0006 # 07 Y:2001 07 2001 MODIFY WORKLOAD $65,000 $5,500 Implemented
WI0395 # 03 Y:2001 03 2001 INSTALL OCCUPANCY SENSORS $1,563 $1,800 Implemented
WI0395 # 04 Y:2001 04 2001 INSTALL OCCUPANCY SENSORS $320 $350 Implemented
WI0395 # 05 Y:2001 05 2001 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $2,257 $6,000 Implemented
IA0263 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,869 $1,014 Implemented