IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,477

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0263 # 02 Y:2001 02 2001 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $2,475 $0 Implemented
IA0263 # 07 Y:2001 07 2001 MODIFY CURRENT INCENTIVE PROGRAM $84,240 $0 Implemented
IA0263 # 08 Y:2001 08 2001 MODIFY CURRENT INCENTIVE PROGRAM $74,880 $0 Implemented
WI0389 # 01 Y:2001 01 2001 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $2,193 $1,000 Implemented
WI0389 # 02 Y:2001 02 2001 INSTALL TIMERS AND/OR THERMOSTATS $1,900 $1,000 Implemented
WI0389 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $456 $1,895 Implemented
WI0389 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $137 $90 Implemented
WI0389 # 08 Y:2001 08 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $270 $120 Implemented
SD0266 # 08 Y:2001 08 2001 INSTALL AUTOMATIC PACKING EQUIPMENT $6,772 $3,400 Implemented
UD0610 # 01 Y:2001 01 2001 IMPROVE SPACE COMFORT CONDITIONING $101,536 $402,000 Implemented
UD0610 # 07 Y:2001 07 2001 RECOVER WASTE HEAT FROM EQUIPMENT $1,984 $6,000 Implemented
MA0480 # 03 Y:2000 03 2000 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $4,330 $8,000 Implemented
MA0480 # 04 Y:2000 04 2000 AIR CONDITION ONLY SPACE NECESSARY $10,600 $5,000 Implemented
MA0480 # 07 Y:2000 07 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,450 $27,000 Implemented
MA0480 # 08 Y:2000 08 2000 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $8,620 $2,000 Implemented
MA0480 # 09 Y:2000 09 2000 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $930 $0 Implemented
MA0480 # 10 Y:2000 10 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,660 $5,000 Implemented
MA0480 # 11 Y:2000 11 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,020 $0 Implemented
MA0480 # 12 Y:2000 12 2000 INSTALL OCCUPANCY SENSORS $12,215 $1,000 Implemented
WV0204 # 02 Y:2000 02 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,068 $17 Implemented
WV0204 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $503 $40 Implemented
WV0204 # 04 Y:2000 04 2000 INSTALL SPECTRAL REFLECTORS / DELAMP $658 $1,088 Implemented
WV0204 # 05 Y:2000 05 2000 INSULATE BARE EQUIPMENT $12,395 $2,180 Implemented
WV0204 # 06 Y:2000 06 2000 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,627 $680 Implemented
WV0204 # 07 Y:2000 07 2000 USE SYNTHETIC LUBRICANT $656 $334 Implemented