Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,477
matching recommendationsSIC | 356 | General Industrial Machinery |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0263 # 02 Y:2001 | 02 | 2001 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $2,475 | $0 | Implemented |
IA0263 # 07 Y:2001 | 07 | 2001 | MODIFY CURRENT INCENTIVE PROGRAM | $84,240 | $0 | Implemented |
IA0263 # 08 Y:2001 | 08 | 2001 | MODIFY CURRENT INCENTIVE PROGRAM | $74,880 | $0 | Implemented |
WI0389 # 01 Y:2001 | 01 | 2001 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $2,193 | $1,000 | Implemented |
WI0389 # 02 Y:2001 | 02 | 2001 | INSTALL TIMERS AND/OR THERMOSTATS | $1,900 | $1,000 | Implemented |
WI0389 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $456 | $1,895 | Implemented |
WI0389 # 07 Y:2001 | 07 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $137 | $90 | Implemented |
WI0389 # 08 Y:2001 | 08 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $270 | $120 | Implemented |
SD0266 # 08 Y:2001 | 08 | 2001 | INSTALL AUTOMATIC PACKING EQUIPMENT | $6,772 | $3,400 | Implemented |
UD0610 # 01 Y:2001 | 01 | 2001 | IMPROVE SPACE COMFORT CONDITIONING | $101,536 | $402,000 | Implemented |
UD0610 # 07 Y:2001 | 07 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,984 | $6,000 | Implemented |
MA0480 # 03 Y:2000 | 03 | 2000 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $4,330 | $8,000 | Implemented |
MA0480 # 04 Y:2000 | 04 | 2000 | AIR CONDITION ONLY SPACE NECESSARY | $10,600 | $5,000 | Implemented |
MA0480 # 07 Y:2000 | 07 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,450 | $27,000 | Implemented |
MA0480 # 08 Y:2000 | 08 | 2000 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $8,620 | $2,000 | Implemented |
MA0480 # 09 Y:2000 | 09 | 2000 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $930 | $0 | Implemented |
MA0480 # 10 Y:2000 | 10 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,660 | $5,000 | Implemented |
MA0480 # 11 Y:2000 | 11 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,020 | $0 | Implemented |
MA0480 # 12 Y:2000 | 12 | 2000 | INSTALL OCCUPANCY SENSORS | $12,215 | $1,000 | Implemented |
WV0204 # 02 Y:2000 | 02 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,068 | $17 | Implemented |
WV0204 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $503 | $40 | Implemented |
WV0204 # 04 Y:2000 | 04 | 2000 | INSTALL SPECTRAL REFLECTORS / DELAMP | $658 | $1,088 | Implemented |
WV0204 # 05 Y:2000 | 05 | 2000 | INSULATE BARE EQUIPMENT | $12,395 | $2,180 | Implemented |
WV0204 # 06 Y:2000 | 06 | 2000 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $2,627 | $680 | Implemented |
WV0204 # 07 Y:2000 | 07 | 2000 | USE SYNTHETIC LUBRICANT | $656 | $334 | Implemented |