IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

67

matching recommendations
Reset
SIC 356 General Industrial Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0016 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,700 $15,500 Implemented
NL0016 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $44,400 $160,000 Implemented
BD0409 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $11,228 $2,550 Implemented
BD0409 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,040 $3,510 Implemented
BD0409 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $535 $450 Implemented
BD0409 # 08 Y:2012 08 2012 USE PHOTOCELL CONTROLS $307 $200 Implemented
BD0409 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,259 $41,728 Implemented
IA0476 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,361 $918 Implemented
IA0421 # 03 Y:2007 03 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $950 $2,575 Implemented
IA0421 # 01 Y:2007 01 2007 REPAIR AND ELIMINATE STEAM LEAKS $5,499 $675 Implemented
IA0421 # 08 Y:2007 08 2007 MINIMIZE WATER USAGE $10,056 $400 Implemented
IA0421 # 06 Y:2007 06 2007 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $2,749 $60 Implemented
IA0421 # 04 Y:2007 04 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,109 $4,080 Implemented
IA0421 # 05 Y:2007 05 2007 MODIFY STARTUP/SHUTDOWN TIMES $2,951 $500 Implemented
IA0421 # 07 Y:2007 07 2007 IMPROVE COMBUSTION CONTROL CAPABILITY $1,093 $1,800 Implemented
IA0419 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $758 $1,001 Implemented
IA0419 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,055 $500 Implemented
IA0419 # 02 Y:2007 02 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $678 $25 Implemented
IA0419 # 07 Y:2007 07 2007 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,450 $1,200 Implemented
IA0419 # 09 Y:2007 09 2007 RECOVER WASTE HEAT FROM EQUIPMENT $2,583 $3,300 Implemented
IA0419 # 10 Y:2007 10 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,325 $800 Implemented
IA0368 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,120 $1,065 Implemented
IA0203 # 08 Y:1998 08 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,783 $2,626 Implemented
IA0203 # 09 Y:1998 09 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $890 $2,000 Implemented
IA0203 # 01 Y:1998 01 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $40,823 $2,000 Implemented