IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

134

matching recommendations
Reset
SIC 3577 Computer Peripheral Equipment, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0393 # 07 Y:2015 07 2015 ELIMINATE/REDUCE AN OPERATION $2,246 $4,783 Not Implemented
SU0393 # 01 Y:2015 01 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,733 $0 Implemented
BS0047 # 05 Y:2015 05 2015 ADOPT IN-HOUSE MATERIAL GENERATION $38,230 $27,200 Not Implemented
BS0047 # 04 Y:2015 04 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $20,278 $200 Not Implemented
BS0047 # 03 Y:2015 03 2015 INSTALL OCCUPANCY SENSORS $1,021 $495 Not Implemented
BS0047 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,127 $32,541 Not Implemented
BS0047 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $536 $15 Implemented
CO0674 # 03 Y:2013 03 2013 AIR CONDITION ONLY SPACE NECESSARY $3,740 $0 Not Implemented
CO0674 # 04 Y:2013 04 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,320 $500 Not Implemented
CO0674 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,830 $250 Implemented
CO0674 # 02 Y:2013 02 2013 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $4,510 $13,600 Not Implemented
CO0674 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,670 $310 Implemented
MZ0023 # 04 Y:2008 04 2008 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,210 $1,941 Not Implemented
MZ0023 # 02 Y:2008 02 2008 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $5,828 $2,077 Not Implemented
MZ0023 # 01 Y:2008 01 2008 INSULATE BARE EQUIPMENT $183 $80 Implemented
MZ0023 # 05 Y:2008 05 2008 REPAIR OR REPLACE STEAM TRAPS $47,858 $40,000 Implemented
MZ0023 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,564 $27,000 Implemented
OR0500 # 07 Y:2006 07 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,400 $1,200 Not Implemented
OR0500 # 01 Y:2006 01 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $23,000 $31,500 Implemented
OR0500 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $15,000 $4,800 Not Implemented
OR0500 # 02 Y:2006 02 2006 INSTALL COMMON HEADER ON COMPRESSORS $36,300 $31,500 Implemented
OR0500 # 03 Y:2006 03 2006 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $39,400 $42,000 Implemented
OR0500 # 05 Y:2006 05 2006 OPTIMIZE PLANT POWER FACTOR $16,600 $10,100 Not Implemented
OR0500 # 04 Y:2006 04 2006 MINIMIZE WATER USAGE $51,600 $105,000 Not Implemented
AS0420 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,338 $5,000 Implemented