IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 358 Refrigeration And Service Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0458 # 01 Y:2014 01 2014 REPAIR AND ELIMINATE STEAM LEAKS $6,859 $840 Implemented
SF0458 # 03 Y:2014 03 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $2,339 $0 Implemented
SF0458 # 04 Y:2014 04 2014 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $1,582 $522 Implemented
SF0458 # 06 Y:2014 06 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $459 $1,384 Implemented
SF0458 # 08 Y:2014 08 2014 REUSE / RECYCLE/ SELL PAPER PRODUCTS $3,900 $0 Implemented
SD0463 # 04 Y:2013 04 2013 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,768 $2,210 Implemented
SD0425 # 05 Y:2010 05 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $42,485 $260,000 Implemented
SD0425 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $496 $1,334 Implemented
LM0001 # 07 Y:2001 07 2001 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $12,500 $0 Implemented
LM0001 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $934 $130 Implemented
LM0001 # 06 Y:2001 06 2001 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $18,500 $600 Implemented
SF0144 # 02 Y:1998 02 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $328 $430 Implemented
SF0144 # 01 Y:1998 01 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $731 $22 Implemented
SF0144 # 05 Y:1998 05 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,768 $0 Implemented
SF0144 # 06 Y:1998 06 1998 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $32,308 $300 Implemented
SF0144 # 07 Y:1998 07 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,556 $300 Implemented
SD0181 # 08 Y:1997 08 1997 INSTALL AUTOMATIC PACKING EQUIPMENT $25,182 $9,000 Implemented
SD0181 # 07 Y:1997 07 1997 WASH AND REUSE RAGS ON-SITE $1,262 $1,600 Implemented
SD0181 # 06 Y:1997 06 1997 CONVERT TO LESS TOXIC HYDROCARBON CLEANERS $2,462 $0 Implemented
SD0181 # 05 Y:1997 05 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $22,100 $9,000 Implemented
SD0181 # 04 Y:1997 04 1997 INSTALL SPECTRAL REFLECTORS / DELAMP $744 $1,190 Implemented
SD0181 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,773 $6,741 Implemented
SD0181 # 02 Y:1997 02 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,392 $0 Implemented
SD0181 # 01 Y:1997 01 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,363 $2,363 Implemented
SD0100 # 02 Y:1994 02 1994 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,434 $2,000 Implemented