IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
SIC 358 Refrigeration And Service Machinery
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0652 # 04 Y:2020 04 2020 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,865 $500 Implemented
NC0652 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $465 $390 Implemented
NC0652 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $631 $700 Implemented
NC0369 # 06 Y:2007 06 2007 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,730 $0 Implemented
NC0369 # 05 Y:2007 05 2007 KEEP BOILER TUBES CLEAN $2,955 $1,000 Implemented
NC0369 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,910 $100 Implemented
NC0369 # 03 Y:2007 03 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $5,420 $1,500 Implemented
NC0369 # 02 Y:2007 02 2007 RECOVER WASTE HEAT FROM EQUIPMENT $9,750 $13,500 Implemented
NC0216 # 01 Y:2001 01 2001 AVOID REWINDING MOTORS MORE THAN TWICE $902 $662 Implemented
NC0216 # 04 Y:2001 04 2001 INSULATE BARE EQUIPMENT $1,799 $549 Implemented
NC0216 # 05 Y:2001 05 2001 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $9,998 $40,000 Implemented
TN0694 # 02 Y:2000 02 2000 ADD AREA LIGHTING SWITCHES $17,510 $25,030 Implemented
TN0694 # 03 Y:2000 03 2000 DEVELOP A REPAIR/REPLACE POLICY $10,755 $5,075 Implemented
TN0694 # 11 Y:2000 11 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $1,365 $0 Implemented
NC0183 # 02 Y:2000 02 2000 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $6,611 $11,000 Implemented
NC0183 # 10 Y:2000 10 2000 SCHEDULE DELIVERIES ACCORDING TO DEMAND $20,448 $5,000 Implemented
NC0183 # 08 Y:2000 08 2000 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $6,838 $3,700 Implemented
NC0183 # 05 Y:2000 05 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $884 $600 Implemented
NC0183 # 04 Y:2000 04 2000 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,091 $3,300 Implemented
NC0183 # 01 Y:2000 01 2000 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,429 $2,731 Implemented
NC0080 # 03 Y:1996 03 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $414 $600 Implemented
NC0080 # 01 Y:1996 01 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $93 $180 Implemented
NC0080 # 06 Y:1996 06 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $566 $1,600 Implemented
NC0074 # 05 Y:1995 05 1995 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $513 $1,200 Implemented
NC0074 # 06 Y:1995 06 1995 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,347 $1,910 Implemented