IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

518

matching recommendations
Reset
SIC 3585 Refrigeration And Heating Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0089 # 05 Y:1996 05 1996 CONVERT TO ELECTROSTATIC POWDER COATING $17,555 $140,000 Implemented
MS0061 # 01 Y:1996 01 1996 RECOVER WASTE HEAT FROM EQUIPMENT $3,595 $1,095 Implemented
MS0061 # 02 Y:1996 02 1996 REDUCE VENTILATION AIR $3,693 $147 Implemented
MS0061 # 03 Y:1996 03 1996 USE SYNTHETIC LUBRICANT $331 $80 Implemented
MS0061 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,776 $576 Implemented
MS0061 # 06 Y:1996 06 1996 INSTALL TIMERS AND/OR THERMOSTATS $1,990 $1,160 Implemented
UL0153 # 03 Y:1996 03 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,723 $85 Implemented
NC0080 # 01 Y:1996 01 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $93 $180 Implemented
NC0080 # 03 Y:1996 03 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $414 $600 Implemented
NC0080 # 06 Y:1996 06 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $566 $1,600 Implemented
UD0479 # 01 Y:1995 01 1995 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,667 $0 Implemented
UD0479 # 02 Y:1995 02 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $12,043 $16,000 Implemented
UD0479 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,152 $17,500 Implemented
UD0479 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,184 $14,654 Implemented
NC0074 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $518 $210 Implemented
NC0074 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,041 $1,134 Implemented
NC0074 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,178 $1,710 Implemented
NC0074 # 05 Y:1995 05 1995 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $513 $1,200 Implemented
NC0074 # 06 Y:1995 06 1995 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,347 $1,910 Implemented
GT0559 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,240 $500 Implemented
GT0559 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,510 $28,740 Implemented
GT0559 # 06 Y:1995 06 1995 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,050 $1,500 Implemented
GT0559 # 07 Y:1995 07 1995 REDUCE VENTILATION AIR $6,030 $2,000 Implemented
AR0056 # 01 Y:1995 01 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $371 $150 Implemented
AR0056 # 02 Y:1995 02 1995 RECOVER WASTE HEAT FROM EQUIPMENT $715 $190 Implemented