IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

63

matching recommendations
Reset
SIC 359 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0640 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,191 $8,424 Implemented
SD0640 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $49,059 $77,697 Implemented
SD0640 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $440 $570 Implemented
SD0640 # 03 Y:2023 03 2023 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $4,401 $6,200 Implemented
SD0640 # 06 Y:2023 06 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $641 $1,749 Implemented
SD0640 # 07 Y:2023 07 2023 USE BATTERY STORAGE FOR DEMAND CONTROL $9,071 $1,121 Implemented
SD0640 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,095 $3,366 Implemented
SD0640 # 01 Y:2023 01 2023 PREVENT EXCESSIVE SOLVENT USAGE (OPERATOR TRAINING) $11,699 $6,300 Implemented
SD0639 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,109 $18,901 Implemented
SD0639 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $55,294 $90,412 Implemented
SD0639 # 02 Y:2023 02 2023 USE BATTERY STORAGE FOR DEMAND CONTROL $15,758 $0 Implemented
SD0639 # 03 Y:2023 03 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,572 $31,410 Implemented
SD0639 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,271 $4,317 Implemented
SD0639 # 06 Y:2023 06 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,370 $18,675 Implemented
SD0639 # 07 Y:2023 07 2023 RECOVER AND REUSE WASTE MATERIAL $69,455 $136,016 Implemented
SD0636 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,654 $4,172 Implemented
SF0568 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,828 $70,690 Implemented
SF0568 # 04 Y:2021 04 2021 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,048 $860 Implemented
SF0568 # 02 Y:2021 02 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,914 $0 Implemented
SF0567 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,911 $0 Implemented
SF0567 # 03 Y:2021 03 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,406 $3,350 Implemented
SF0567 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,660 $40,195 Implemented
SD0583 # 02 Y:2019 02 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $30,675 $66,500 Implemented
SD0583 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,834 $8,535 Implemented
SD0583 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,649 $15,975 Implemented