Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
31
matching recommendationsSIC | 359 | Industrial Machinery, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0149 # 02 Y:2019 | 02 | 2019 | OPTIMIZE PLANT POWER FACTOR | $12,647 | $110,950 | Implemented |
WM0149 # 07 Y:2019 | 07 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,693 | $4,000 | Implemented |
WI0516 # 04 Y:2006 | 04 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,311 | $1,000 | Implemented |
WI0516 # 02 Y:2006 | 02 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,265 | $33,480 | Implemented |
WI0516 # 07 Y:2006 | 07 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,352 | $2,560 | Implemented |
WI0465 # 07 Y:2004 | 07 | 2004 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,126 | $700 | Implemented |
WI0465 # 02 Y:2004 | 02 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,432 | $11,183 | Implemented |
WI0465 # 01 Y:2004 | 01 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,760 | $16,000 | Implemented |
WI0444 # 06 Y:2003 | 06 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $983 | $740 | Implemented |
WI0444 # 01 Y:2003 | 01 | 2003 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $6,597 | $9,000 | Implemented |
WI0444 # 03 Y:2003 | 03 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,189 | $8,655 | Implemented |
WI0417 # 08 Y:2002 | 08 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $923 | $1,647 | Implemented |
WI0417 # 07 Y:2002 | 07 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,318 | $740 | Implemented |
WI0417 # 06 Y:2002 | 06 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,606 | $339 | Implemented |
WI0417 # 01 Y:2002 | 01 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,160 | $2,000 | Implemented |
WI0417 # 02 Y:2002 | 02 | 2002 | TREAT AND REUSE RINSE WATERS | $7,660 | $8,000 | Implemented |
WI0416 # 07 Y:2002 | 07 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,411 | $6,600 | Implemented |
WI0416 # 09 Y:2002 | 09 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $477 | $0 | Implemented |
WI0416 # 05 Y:2002 | 05 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,925 | $90 | Implemented |
WI0416 # 03 Y:2002 | 03 | 2002 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,968 | $0 | Implemented |
WI0416 # 02 Y:2002 | 02 | 2002 | INSTALL TIMERS AND/OR THERMOSTATS | $3,608 | $400 | Implemented |
WI0405 # 05 Y:2001 | 05 | 2001 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,216 | $500 | Implemented |
WI0405 # 04 Y:2001 | 04 | 2001 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $2,138 | $0 | Implemented |
WI0405 # 02 Y:2001 | 02 | 2001 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,749 | $2,000 | Implemented |
WI0405 # 01 Y:2001 | 01 | 2001 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $5,787 | $4,500 | Implemented |