IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

52

matching recommendations
Reset
SIC 359 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0771 # 02 Y:2003 02 2003 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $17,568 $23,870 Implemented
GT0771 # 03 Y:2003 03 2003 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $882 $650 Implemented
GT0771 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,260 $1,050 Implemented
GT0771 # 01 Y:2003 01 2003 COMBINE UTILITY METERS $3,600 $0 Implemented
OK0669 # 02 Y:2003 02 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,435 $8,500 Implemented
OK0669 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,626 $3,500 Implemented
OK0669 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $1,966 $3,467 Implemented
OK0669 # 06 Y:2003 06 2003 INSTALL SET-BACK TIMERS $1,069 $463 Implemented
OK0669 # 07 Y:2003 07 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $6,052 $1,468 Implemented
UF0328 # 07 Y:2003 07 2003 $3,900 $4,000 Implemented
UF0328 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,031 $0 Implemented
UF0328 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,810 $0 Implemented
UF0328 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,817 $12,292 Implemented
UF0328 # 01 Y:2003 01 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,395 $0 Implemented
WV0270 # 06 Y:2003 06 2003 INSULATE BARE EQUIPMENT $7,108 $1,418 Implemented
WV0270 # 09 Y:2003 09 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,937 $250 Implemented
WV0270 # 11 Y:2003 11 2003 INSTALL OCCUPANCY SENSORS $2,244 $1,450 Implemented
WV0270 # 03 Y:2003 03 2003 DEVELOP A REPAIR/REPLACE POLICY $6,214 $625 Implemented
WV0270 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,616 $0 Implemented
WV0270 # 02 Y:2003 02 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,533 $0 Implemented
WV0270 # 12 Y:2003 12 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,750 $4,590 Implemented
WV0270 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,121 $150 Implemented
LL0167 # 08 Y:2003 08 2003 USE PHOTOCELL CONTROLS $113 $40 Implemented
LL0167 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $130 $80 Implemented
LL0167 # 03 Y:2003 03 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $848 $90 Implemented