Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
41
matching recommendationsSIC | 359 | Industrial Machinery, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0291 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,753 | $500 | n/a |
UA0291 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,693 | $8,473 | n/a |
UA0291 # 03 Y:2024 | 03 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $178,998 | $1,000,734 | n/a |
UA0291 # 04 Y:2024 | 04 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $531 | $1,463 | n/a |
UA0291 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $688 | $3,738 | n/a |
UA0291 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $107 | $452 | n/a |
UA0276 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,109 | $57,867 | Implemented |
UA0276 # 04 Y:2023 | 04 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $12,760 | $35,064 | Implemented |
UA0276 # 05 Y:2023 | 05 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $1,613 | $1,169 | Not Implemented |
UA0276 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,956 | $1,000 | Not Implemented |
UA0276 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,633 | $8,591 | Implemented |
UA0249 # 04 Y:2021 | 04 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,213 | $100 | Not Implemented |
UA0249 # 05 Y:2021 | 05 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,261 | $8,080 | Implemented |
UA0249 # 02 Y:2021 | 02 | 2021 | USE RADIANT HEATER FOR SPOT HEATING | $15,788 | $20,165 | Not Implemented |
UA0249 # 03 Y:2021 | 03 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $320 | $20 | Implemented |
UA0249 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,396 | $17,269 | Implemented |
UA0231 # 01 Y:2020 | 01 | 2020 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $37,963 | $29,625 | Not Implemented |
UA0231 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,948 | $4,200 | Implemented |
UA0231 # 02 Y:2020 | 02 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $538 | $121 | Implemented |
UA0231 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,318 | $21,905 | Not Implemented |
UA0231 # 04 Y:2020 | 04 | 2020 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $3,981 | $17,881 | Not Implemented |
UA0231 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,885 | $500 | Implemented |
UA0091 # 01 Y:2012 | 01 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,610 | $1,600 | Not Implemented |
UA0091 # 04 Y:2012 | 04 | 2012 | REDUCE VENTILATION AIR | $132 | $210 | Not Implemented |
UA0091 # 03 Y:2012 | 03 | 2012 | INSTALL TIMERS AND/OR THERMOSTATS | $2,368 | $546 | Implemented |