IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

116

matching recommendations
Reset
SIC 3593 Fluid Power Cylinders & Actuators
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1314 # 08 Y:2013 08 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $798 $700 Implemented
UK1314 # 04 Y:2013 04 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,453 $15,000 Implemented
UK1314 # 05 Y:2013 05 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,066 $0 Implemented
UK1314 # 01 Y:2013 01 2013 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $12,434 $44,000 Implemented
UK1314 # 10 Y:2013 10 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $690 $690 Implemented
UK1314 # 09 Y:2013 09 2013 USE PHOTOCELL CONTROLS $328 $592 Implemented
UK1314 # 02 Y:2013 02 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,512 $28,560 Implemented
UK1314 # 06 Y:2013 06 2013 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,594 $0 Implemented
UK1314 # 07 Y:2013 07 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $1,662 $650 Implemented
UK1314 # 03 Y:2013 03 2013 RECOVER WASTE HEAT FROM EQUIPMENT $3,739 $4,500 Implemented
IP0011 # 05 Y:2013 05 2013 SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS $980 $0 Implemented
IP0011 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,428 $0 Implemented
IP0011 # 02 Y:2013 02 2013 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $12,093 $0 Implemented
IP0011 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,058 $0 Implemented
IP0011 # 01 Y:2013 01 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $13,897 $0 Implemented
IP0011 # 09 Y:2013 09 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,010 $27,442 Implemented
UA0091 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $710 $1,300 Implemented
UA0091 # 03 Y:2012 03 2012 INSTALL TIMERS AND/OR THERMOSTATS $2,368 $546 Implemented
IP0004 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,520 $0 Implemented
IP0004 # 04 Y:2012 04 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $21,686 $18,150 Implemented
IP0004 # 03 Y:2012 03 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,110 $0 Implemented
IP0004 # 02 Y:2012 02 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,343 $0 Implemented
IA0472 # 04 Y:2011 04 2011 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $1,084 $358 Implemented
IA0472 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,302 $420 Implemented
IA0472 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,172 $10,141 Implemented