IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 3599 Industrial Machinery, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0149 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,693 $4,000 Implemented
WM0149 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $12,647 $110,950 Implemented
WI0516 # 07 Y:2006 07 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,352 $2,560 Implemented
WI0516 # 04 Y:2006 04 2006 RECOVER WASTE HEAT FROM EQUIPMENT $5,311 $1,000 Implemented
WI0516 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,265 $33,480 Implemented
WI0465 # 07 Y:2004 07 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,126 $700 Implemented
WI0465 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,432 $11,183 Implemented
WI0465 # 01 Y:2004 01 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,760 $16,000 Implemented
WI0444 # 01 Y:2003 01 2003 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $6,597 $9,000 Implemented
WI0444 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $983 $740 Implemented
WI0444 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,189 $8,655 Implemented
WI0417 # 08 Y:2002 08 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $923 $1,647 Implemented
WI0417 # 07 Y:2002 07 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,318 $740 Implemented
WI0417 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,606 $339 Implemented
WI0417 # 02 Y:2002 02 2002 TREAT AND REUSE RINSE WATERS $7,660 $8,000 Implemented
WI0417 # 01 Y:2002 01 2002 RECOVER WASTE HEAT FROM EQUIPMENT $8,160 $2,000 Implemented
WI0416 # 02 Y:2002 02 2002 INSTALL TIMERS AND/OR THERMOSTATS $3,608 $400 Implemented
WI0416 # 09 Y:2002 09 2002 RECOVER WASTE HEAT FROM EQUIPMENT $477 $0 Implemented
WI0416 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,411 $6,600 Implemented
WI0416 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,925 $90 Implemented
WI0416 # 03 Y:2002 03 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,968 $0 Implemented