Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
31
matching recommendationsSIC | 3599 | Industrial Machinery, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0276 # 05 Y:2023 | 05 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $1,613 | $1,169 | Not Implemented |
UA0276 # 04 Y:2023 | 04 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $12,760 | $35,064 | Implemented |
UA0276 # 03 Y:2023 | 03 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,956 | $1,000 | Not Implemented |
UA0276 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,633 | $8,591 | Implemented |
UA0276 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,109 | $57,867 | Implemented |
UA0249 # 05 Y:2021 | 05 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,261 | $8,080 | Implemented |
UA0249 # 04 Y:2021 | 04 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,213 | $100 | Not Implemented |
UA0249 # 03 Y:2021 | 03 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $320 | $20 | Implemented |
UA0249 # 02 Y:2021 | 02 | 2021 | USE RADIANT HEATER FOR SPOT HEATING | $15,788 | $20,165 | Not Implemented |
UA0249 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,396 | $17,269 | Implemented |
UA0231 # 01 Y:2020 | 01 | 2020 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $37,963 | $29,625 | Not Implemented |
UA0231 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,948 | $4,200 | Implemented |
UA0231 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,885 | $500 | Implemented |
UA0231 # 04 Y:2020 | 04 | 2020 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $3,981 | $17,881 | Not Implemented |
UA0231 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,318 | $21,905 | Not Implemented |
UA0231 # 02 Y:2020 | 02 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $538 | $121 | Implemented |
UA0090 # 07 Y:2012 | 07 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,484 | $12,249 | Not Implemented |
UA0090 # 06 Y:2012 | 06 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,138 | $2,200 | Implemented |
UA0090 # 05 Y:2012 | 05 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,230 | $4,203 | Not Implemented |
UA0090 # 04 Y:2012 | 04 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,518 | $13,900 | Not Implemented |
UA0090 # 03 Y:2012 | 03 | 2012 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $5,678 | $142 | Implemented |
UA0090 # 02 Y:2012 | 02 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,021 | $2,488 | Not Implemented |
UA0090 # 01 Y:2012 | 01 | 2012 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $11,862 | $26,757 | Not Implemented |
UA0057 # 01 Y:2010 | 01 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,876 | $3,000 | Implemented |
UA0057 # 08 Y:2010 | 08 | 2010 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,029 | $12,535 | Not Implemented |