IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,726

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0147 # 03 Y:1984 03 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,650 $6,252 Implemented
OK0147 # 05 Y:1984 05 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,120 $1,236 Implemented
OK0147 # 06 Y:1984 06 1984 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $566 $333 Implemented
OK0147 # 07 Y:1984 07 1984 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,671 $1,647 Implemented
OK0147 # 08 Y:1984 08 1984 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,036 $720 Implemented
OK0147 # 09 Y:1984 09 1984 INSTALL TIMERS AND/OR THERMOSTATS $492 $291 Implemented
OK0147 # 10 Y:1984 10 1984 TURN OFF EQUIPMENT WHEN NOT IN USE $6,362 $1,090 Implemented
TN0218 # 03 Y:1984 03 1984 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $4,352 $3,700 Implemented
TN0218 # 07 Y:1984 07 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $677 $90 Implemented
UD0137 # 01 Y:1984 01 1984 INSULATE BARE EQUIPMENT $6,700 $3,000 Implemented
TN0216 # 02 Y:1984 02 1984 INSTALL SET-BACK TIMERS $8,300 $0 Implemented
TN0216 # 05 Y:1984 05 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $774 $0 Implemented
TN0216 # 07 Y:1984 07 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $112 $0 Implemented
OK0142 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $164 $268 Implemented
OK0142 # 02 Y:1984 02 1984 REDUCE VENTILATION AIR $125 $0 Implemented
OK0142 # 04 Y:1984 04 1984 INSULATE BARE EQUIPMENT $488 $58 Implemented
KU0121 # 01 Y:1984 01 1984 INSTALL TIMERS AND/OR THERMOSTATS $8,835 $0 Implemented
KU0121 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,383 $2,250 Implemented
KU0121 # 04 Y:1984 04 1984 INSULATE BARE EQUIPMENT $3,959 $1,000 Implemented
KU0121 # 06 Y:1984 06 1984 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $2,034 $738 Implemented
KU0121 # 07 Y:1984 07 1984 USE MINIMUM SAFE OVEN VENTILATION $474 $0 Implemented
KU0121 # 09 Y:1984 09 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $835 $1,200 Implemented
KU0121 # 11 Y:1984 11 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $298 $100 Implemented
OK0135 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,133 $856 Implemented
OK0135 # 03 Y:1984 03 1984 RECOVER WASTE HEAT FROM EQUIPMENT $207 $198 Implemented