Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,791
matching recommendationsSIC | 36 | Electronic & Other Electric Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0947 # 07 Y:2016 | 07 | 2016 | IMPROVE COMBUSTION CONTROL CAPABILITY | $577 | $0 | Implemented |
UD0947 # 09 Y:2016 | 09 | 2016 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $6,493 | $400 | Implemented |
UD0947 # 10 Y:2016 | 10 | 2016 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $495 | $50 | Implemented |
SU0409 # 02 Y:2016 | 02 | 2016 | REDUCE VENTILATION AIR | $1,604 | $822 | Implemented |
SU0409 # 03 Y:2016 | 03 | 2016 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $1,899 | $1,546 | Implemented |
SU0409 # 04 Y:2016 | 04 | 2016 | INSTALL / REPAIR INSULATION ON STEAM LINES | $292 | $233 | Implemented |
SU0409 # 06 Y:2016 | 06 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $36 | $63 | Implemented |
SU0409 # 07 Y:2016 | 07 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $498 | $1,262 | Implemented |
MA0756 # 01 Y:2016 | 01 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,102 | $6,500 | Implemented |
MA0756 # 03 Y:2016 | 03 | 2016 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,797 | $7,000 | Implemented |
MI0294 # 02 Y:2016 | 02 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $42,734 | $29,594 | Implemented |
MI0294 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,388 | $1,660 | Implemented |
MI0294 # 05 Y:2016 | 05 | 2016 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $5,921 | $1,441 | Implemented |
MI0294 # 07 Y:2016 | 07 | 2016 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $4,081 | $4,200 | Implemented |
MI0294 # 08 Y:2016 | 08 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,830 | $40 | Implemented |
MI0294 # 11 Y:2016 | 11 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,797 | $40 | Implemented |
MI0294 # 16 Y:2016 | 16 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $342 | $375 | Implemented |
MZ0204 # 01 Y:2016 | 01 | 2016 | INSTALL OCCUPANCY SENSORS | $3,536 | $1,500 | Implemented |
MZ0204 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,259 | $37,722 | Implemented |
MZ0204 # 03 Y:2016 | 03 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,678 | $1,200 | Implemented |
MZ0204 # 05 Y:2016 | 05 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,246 | $1,212 | Implemented |
MZ0203 # 01 Y:2016 | 01 | 2016 | INSTALL OCCUPANCY SENSORS | $3,747 | $680 | Implemented |
MZ0203 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,707 | $11,425 | Implemented |
MZ0203 # 03 Y:2016 | 03 | 2016 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $324 | $1,975 | Implemented |
MZ0197 # 01 Y:2015 | 01 | 2015 | INSTALL OCCUPANCY SENSORS | $5,337 | $1,752 | Implemented |