Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
147
matching recommendationsSIC | 36 | Electronic & Other Electric Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0302 # 05 Y:2023 | 05 | 2023 | METER WASTE WATER | $18,930 | $1,100 | Implemented |
TT0302 # 01 Y:2023 | 01 | 2023 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $141,741 | $909,720 | Implemented |
TT0302 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,127 | $1,500 | Implemented |
TT0298 # 10 Y:2023 | 10 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,044 | $13,500 | Implemented |
TT0298 # 07 Y:2023 | 07 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,545 | $31,800 | Implemented |
TT0298 # 01 Y:2023 | 01 | 2023 | MINIMIZE WATER USAGE | $54,343 | $42,000 | Implemented |
TT0298 # 11 Y:2023 | 11 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,983 | $9,000 | Implemented |
TT0298 # 12 Y:2023 | 12 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,575 | $2,010 | Implemented |
TT0298 # 09 Y:2023 | 09 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,862 | $9,000 | Implemented |
TT0297 # 07 Y:2023 | 07 | 2023 | REUSE RICH WHITE WATER IN OTHER APPLICATIONS | $1,230 | $1,820 | Implemented |
TT0297 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,512 | $6,000 | Implemented |
TT0297 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,428 | $1,950 | Implemented |
TT0297 # 04 Y:2023 | 04 | 2023 | OPTIMIZE PLANT POWER FACTOR | $8,533 | $20,000 | Implemented |
TT0297 # 03 Y:2023 | 03 | 2023 | INSTALL OCCUPANCY SENSORS | $11,161 | $14,500 | Implemented |
TT0244 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $97,307 | $190,198 | Implemented |
TT0244 # 04 Y:2020 | 04 | 2020 | INSTALL TIMERS AND/OR THERMOSTATS | $4,684 | $200 | Implemented |
TT0233 # 02 Y:2020 | 02 | 2020 | METER WASTE WATER | $52,049 | $2,000 | Implemented |
TT0233 # 01 Y:2020 | 01 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $57,084 | $30,000 | Implemented |
TT0233 # 04 Y:2020 | 04 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $12,859 | $20 | Implemented |
TT0233 # 03 Y:2020 | 03 | 2020 | OPTIMIZE PLANT POWER FACTOR | $43,091 | $147,540 | Implemented |
TT0233 # 06 Y:2020 | 06 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,658 | $2,000 | Implemented |
TT0227 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,227 | $2,000 | Implemented |
TT0227 # 05 Y:2019 | 05 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $2,646 | $2,000 | Implemented |
TT0227 # 03 Y:2019 | 03 | 2019 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $4,828 | $5,000 | Implemented |
TT0225 # 01 Y:2019 | 01 | 2019 | APPLY FOR INVESTMENT INCENTIVES | $61,196 | $11,500 | Implemented |