IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

198

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0890 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,090 $1,000 Implemented
AM0890 # 08 Y:2023 08 2023 INSTALL OCCUPANCY SENSORS $240 $480 Implemented
AM0890 # 06 Y:2023 06 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,790 $18 Implemented
AM0890 # 02 Y:2023 02 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,660 $2,690 Implemented
NT0013 # 05 Y:2023 05 2023 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $17,430 $54,000 Implemented
NT0013 # 04 Y:2023 04 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $49,000 $83,421 Implemented
NT0013 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,755 $21,512 Implemented
NT0013 # 01 Y:2023 01 2023 UPGRADE CONTROLS ON COMPRESSORS $71,747 $106,919 Implemented
NT0013 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,102 $0 Implemented
NT0013 # 07 Y:2023 07 2023 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $720,000 $120,000 Implemented
NT0007 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,184 $5,993 Implemented
AM0824 # 03 Y:2021 03 2021 INSTALL OCCUPANCY SENSORS $700 $360 Implemented
AM0824 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,660 $4,400 Implemented
AM0814 # 05 Y:2020 05 2020 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,470 $4,340 Implemented
AM0814 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,540 $1,000 Implemented
AM0814 # 02 Y:2020 02 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $7,570 $2,000 Implemented
AM0814 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $500 $25 Implemented
AM0814 # 07 Y:2020 07 2020 PAY UTILITY BILLS ON TIME $490 $0 Implemented
AM0814 # 08 Y:2020 08 2020 USE SYNTHETIC LUBRICANT $300 $200 Implemented
AM0814 # 01 Y:2020 01 2020 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $74,300 $7,400 Implemented
AM0779 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,380 $3,300 Implemented
AM0779 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,460 $16,000 Implemented
AM0779 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,795 $1,000 Implemented
TR0009 # 04 Y:2018 04 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $2,987 $15,373 Implemented
TR0009 # 02 Y:2018 02 2018 RECYCLE FLUORESCENT LAMPS $6,608 $13,260 Implemented