IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 362 Electrical Industrial Apparatus
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0538 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $828 $100 Implemented
NC0538 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $424 $1,767 Implemented
NC0528 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,097 $100 Implemented
NC0528 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,526 $100 Implemented
NC0528 # 03 Y:2014 03 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,799 $150 Implemented
NC0528 # 04 Y:2014 04 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,209 $1,935 Implemented
NC0528 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $612 $754 Implemented
NC0528 # 09 Y:2014 09 2014 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,119 $100 Implemented
TN0692 # 07 Y:2000 07 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,600 $900 Implemented
TN0692 # 06 Y:2000 06 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $3,650 $0 Implemented
TN0692 # 05 Y:2000 05 2000 RECOVER AND REUSE WASTE MATERIAL $4,210 $0 Implemented
TN0692 # 02 Y:2000 02 2000 ADD ADDITIONAL PRODUCTION SHIFT $899,000 $967,000 Implemented
TN0692 # 08 Y:2000 08 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,336 $0 Implemented
TN0692 # 09 Y:2000 09 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,115 $1,300 Implemented
NC0049 # 08 Y:1995 08 1995 REDUCE GLAZED AREAS IN BUILDINGS $5,285 $1,400 Implemented
NC0049 # 06 Y:1995 06 1995 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $4,915 $2,000 Implemented
NC0049 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,182 $1,290 Implemented
NC0028 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $736 $1,510 Implemented
NC0028 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,218 $600 Implemented
NC0028 # 01 Y:1994 01 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $153 $250 Implemented
TN0513 # 02 Y:1994 02 1994 CLOSE OFF UNNEEDED STEAM LINES $1,428 $0 Implemented
TN0513 # 05 Y:1994 05 1994 INSULATE BARE EQUIPMENT $168 $95 Implemented
TN0513 # 06 Y:1994 06 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $638 $480 Implemented
TN0513 # 10 Y:1994 10 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $263 $0 Implemented
TN0381 # 03 Y:1989 03 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,515 $1,800 Implemented