Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsSIC | 362 | Electrical Industrial Apparatus |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0514 # 01 Y:2015 | 01 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,361 | $688 | Implemented |
WV0514 # 05 Y:2015 | 05 | 2015 | INSTALL OCCUPANCY SENSORS | $1,756 | $420 | Implemented |
WV0514 # 06 Y:2015 | 06 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,663 | $0 | Implemented |
WV0514 # 07 Y:2015 | 07 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $1,005 | $256 | Implemented |
WV0514 # 08 Y:2015 | 08 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $842 | $50 | Implemented |
UD0672 # 01 Y:2003 | 01 | 2003 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $7,766 | $0 | Implemented |
UD0672 # 03 Y:2003 | 03 | 2003 | UPGRADE CONTROLS ON COMPRESSORS | $2,100 | $136 | Implemented |
UD0672 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,550 | $143 | Implemented |
UD0672 # 06 Y:2003 | 06 | 2003 | DISCONNECT BALLASTS | $963 | $323 | Implemented |
UD0672 # 08 Y:2003 | 08 | 2003 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $815 | $218 | Implemented |
UD0672 # 11 Y:2003 | 11 | 2003 | ADD AREA LIGHTING SWITCHES | $264 | $640 | Implemented |
UD0672 # 13 Y:2003 | 13 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $47 | $3 | Implemented |
UD0562 # 02 Y:1999 | 02 | 1999 | USE POWER DURING OFF-PEAK PERIODS | $10,130 | $0 | Implemented |
UD0562 # 04 Y:1999 | 04 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,677 | $1,040 | Implemented |
UD0558 # 01 Y:1998 | 01 | 1998 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $18,790 | $8,000 | Implemented |
UD0558 # 05 Y:1998 | 05 | 1998 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $1,200 | $0 | Implemented |
UD0558 # 02 Y:1998 | 02 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,343 | $45,360 | Implemented |
UD0558 # 04 Y:1998 | 04 | 1998 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,453 | $8,000 | Implemented |
UD0378 # 04 Y:1992 | 04 | 1992 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $13,114 | $14,400 | Implemented |
UD0039 # 03 Y:1982 | 03 | 1982 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $357 | $300 | Implemented |
UD0039 # 04 Y:1982 | 04 | 1982 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $7,302 | $13,500 | Implemented |
UD0039 # 05 Y:1982 | 05 | 1982 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $1,253 | $7,000 | Implemented |
UD0039 # 02 Y:1982 | 02 | 1982 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $480 | $0 | Implemented |
UD0039 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,698 | $1,557 | Implemented |
UD0031 # 02 Y:1982 | 02 | 1982 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $256 | $0 | Implemented |