IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
SIC 362 Electrical Industrial Apparatus
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0514 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,361 $688 Implemented
WV0514 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $1,756 $420 Implemented
WV0514 # 06 Y:2015 06 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,663 $0 Implemented
WV0514 # 07 Y:2015 07 2015 DEVELOP A REPAIR/REPLACE POLICY $1,005 $256 Implemented
WV0514 # 08 Y:2015 08 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $842 $50 Implemented
UD0672 # 01 Y:2003 01 2003 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $7,766 $0 Implemented
UD0672 # 03 Y:2003 03 2003 UPGRADE CONTROLS ON COMPRESSORS $2,100 $136 Implemented
UD0672 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,550 $143 Implemented
UD0672 # 06 Y:2003 06 2003 DISCONNECT BALLASTS $963 $323 Implemented
UD0672 # 08 Y:2003 08 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $815 $218 Implemented
UD0672 # 11 Y:2003 11 2003 ADD AREA LIGHTING SWITCHES $264 $640 Implemented
UD0672 # 13 Y:2003 13 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $47 $3 Implemented
UD0562 # 02 Y:1999 02 1999 USE POWER DURING OFF-PEAK PERIODS $10,130 $0 Implemented
UD0562 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,677 $1,040 Implemented
UD0558 # 01 Y:1998 01 1998 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $18,790 $8,000 Implemented
UD0558 # 05 Y:1998 05 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,200 $0 Implemented
UD0558 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,343 $45,360 Implemented
UD0558 # 04 Y:1998 04 1998 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,453 $8,000 Implemented
UD0378 # 04 Y:1992 04 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $13,114 $14,400 Implemented
UD0039 # 03 Y:1982 03 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $357 $300 Implemented
UD0039 # 04 Y:1982 04 1982 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $7,302 $13,500 Implemented
UD0039 # 05 Y:1982 05 1982 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $1,253 $7,000 Implemented
UD0039 # 02 Y:1982 02 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $480 $0 Implemented
UD0039 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,698 $1,557 Implemented
UD0031 # 02 Y:1982 02 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $256 $0 Implemented