IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,331

matching recommendations
Reset
SIC 362 Electrical Industrial Apparatus
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0180 # 04 Y:1999 04 1999 USE OPTIMUM THICKNESS INSULATION $2,992 $1,125 Not Implemented
WV0180 # 05 Y:1999 05 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $39,780 $3,000 Implemented
WV0180 # 06 Y:1999 06 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,447 $27 Not Implemented
WV0180 # 07 Y:1999 07 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $71,180 $39,000 Not Implemented
WV0180 # 08 Y:1999 08 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $370 $90 Not Implemented
WV0180 # 09 Y:1999 09 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $550 $201 Implemented
WV0180 # 10 Y:1999 10 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $750 $250 Not Implemented
WV0180 # 11 Y:1999 11 1999 USE EVAPORATION TO CONCENTRATE MATERIAL $1,107 $50 Not Implemented
WV0180 # 12 Y:1999 12 1999 INSTALL SYSTEM TO COLLECT SCRAP $8,308 $500 Implemented
WI0354 # 01 Y:1999 01 1999 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $7,740 $21,000 Not Implemented
WI0354 # 02 Y:1999 02 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,469 $500 Implemented
WI0354 # 03 Y:1999 03 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $5,465 $0 Implemented
WI0354 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,567 $18,988 Implemented
WI0354 # 05 Y:1999 05 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $2,618 $500 Not Implemented
WI0354 # 06 Y:1999 06 1999 INSTALL TIMERS AND/OR THERMOSTATS $2,328 $400 Implemented
WI0354 # 07 Y:1999 07 1999 DISTILL CONTAMINATED SOLVENTS FOR REUSE $1,418 $4,850 Not Implemented
WI0354 # 08 Y:1999 08 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,284 $5,000 Implemented
WI0354 # 09 Y:1999 09 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $477 $180 Implemented
WI0354 # 10 Y:1999 10 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $373 $640 Implemented
WI0354 # 11 Y:1999 11 1999 RECOVER WASTE HEAT FROM EQUIPMENT $360 $800 Implemented
OD0139 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,834 $61,640 Not Implemented
OD0139 # 02 Y:1999 02 1999 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $447 $4,020 Not Implemented
OD0139 # 03 Y:1999 03 1999 MODERATE COOLING TOWER OUTLET TEMPERATURE $82 $20 Not Implemented
OD0139 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,555 $2,000 Not Implemented
OK0578 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,087 $500 n/a