IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

79

matching recommendations
Reset
SIC 3645 Residential Lighting Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0661 # 06 Y:1999 06 1999 REDUCE SCRAP PRODUCTION $215,560 $112,500 Implemented
GT0661 # 07 Y:1999 07 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $673,610 $245,000 Implemented
GT0660 # 06 Y:1999 06 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,900 $0 Implemented
GT0660 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,150 $1,000 Implemented
GT0660 # 08 Y:1999 08 1999 MAINTAIN/ENLARGE A STOCK OF SPARE PARTS $161,575 $300,000 Implemented
WI0290 # 01 Y:1997 01 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $119,620 $15,000 Implemented
WI0290 # 03 Y:1997 03 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $7,560 $5,000 Implemented
WI0290 # 05 Y:1997 05 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,755 $330 Implemented
WI0290 # 08 Y:1997 08 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,333 $500 Implemented
WI0290 # 09 Y:1997 09 1997 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,280 $1,120 Implemented
AR0082 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,355 $1,976 Implemented
AR0082 # 04 Y:1996 04 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $549 $100 Implemented
AR0082 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,725 $140 Implemented
AR0082 # 06 Y:1996 06 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $709 $1,830 Implemented
AR0082 # 07 Y:1996 07 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $119 $0 Implemented
AR0082 # 08 Y:1996 08 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $27,454 $1,488 Implemented
AR0082 # 01 Y:1996 01 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,317 $720 Implemented
BD0027 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,804 $450 Implemented
HO0073 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,474 $6,062 Implemented
HO0073 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $875 $2,802 Implemented
HO0073 # 06 Y:1994 06 1994 INSULATE BARE EQUIPMENT $324 $790 Implemented
HO0073 # 05 Y:1994 05 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $123 $204 Implemented
HO0073 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $168 $475 Implemented
KU0097 # 11 Y:1983 11 1983 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $352 $100 Implemented
KU0097 # 10 Y:1983 10 1983 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $983 $192 Implemented