IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

43

matching recommendations
Reset
SIC 3669 Communications Equipment, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0890 # 02 Y:2023 02 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,660 $2,690 Implemented
AM0890 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,090 $1,000 Implemented
AM0890 # 06 Y:2023 06 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,790 $18 Implemented
AM0890 # 08 Y:2023 08 2023 INSTALL OCCUPANCY SENSORS $240 $480 Implemented
AM0645 # 02 Y:2013 02 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,290 $750 Implemented
AM0645 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $570 $60 Implemented
AM0645 # 01 Y:2013 01 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $9,885 $63,000 Implemented
IA0259 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $530 $1,073 Implemented
IA0259 # 08 Y:2000 08 2000 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $208 $30 Implemented
IA0259 # 07 Y:2000 07 2000 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING $1,445 $5,020 Implemented
IA0259 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,277 $139 Implemented
DS0172 # 03 Y:2000 03 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $1,033 $2,718 Implemented
DS0172 # 05 Y:2000 05 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,262 $4,230 Implemented
DS0172 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $569 $864 Implemented
DS0172 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,907 $8,927 Implemented
OR0313 # 04 Y:1998 04 1998 $6,605 $0 Implemented
OR0313 # 01 Y:1998 01 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $59,850 $437 Implemented
OR0313 # 06 Y:1998 06 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $9,060 $2,670 Implemented
ME0153 # 04 Y:1995 04 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $899 $1,350 Implemented
ME0153 # 06 Y:1995 06 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $580 $300 Implemented
ME0153 # 08 Y:1995 08 1995 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $13,800 $10,000 Implemented
ME0153 # 10 Y:1995 10 1995 ELIMINATE LEAKS IN WATER LINES AND VALVES $926 $50 Implemented
NC0050 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,208 $4,662 Implemented
NC0050 # 02 Y:1995 02 1995 INSULATE BARE EQUIPMENT $4,041 $9,817 Implemented
NC0050 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $291 $1,320 Implemented