IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,411

matching recommendations
Reset
SIC 367 Electronic Components And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0546 # 06 Y:2004 06 2004 RECOVER WASTE HEAT FROM EQUIPMENT $2,243 $3,230 Implemented
MA0546 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $832 $3,000 Implemented
IC0071 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,349 $3,502 Implemented
IC0071 # 05 Y:2003 05 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,250 $3,184 Implemented
IC0071 # 06 Y:2003 06 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,367 $0 Implemented
IC0071 # 07 Y:2003 07 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $553 $0 Implemented
IC0071 # 08 Y:2003 08 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $11,135 $0 Implemented
IC0071 # 09 Y:2003 09 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,477 $5,700 Implemented
IC0071 # 10 Y:2003 10 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $339 $1,887 Implemented
MA0541 # 04 Y:2003 04 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $12,264 $5,500 Implemented
MA0541 # 06 Y:2003 06 2003 USE MINIMUM STEAM OPERATING PRESSURE $5,023 $5,000 Implemented
MA0541 # 08 Y:2003 08 2003 INSULATE BARE EQUIPMENT $635 $260 Implemented
UD0681 # 01 Y:2003 01 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $82,000 $1,490 Implemented
UD0681 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,862 $7,947 Implemented
UD0681 # 07 Y:2003 07 2003 AIR CONDITION ONLY SPACE NECESSARY $1,800 $0 Implemented
UD0681 # 08 Y:2003 08 2003 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $1,740 $0 Implemented
UD0681 # 11 Y:2003 11 2003 INSULATE BARE EQUIPMENT $930 $1,360 Implemented
UD0681 # 13 Y:2003 13 2003 DISCONNECT BALLASTS $159 $46 Implemented
CO0528 # 01 Y:2003 01 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $20,940 $4,360 Implemented
LM0066 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $462 $20 Implemented
LM0066 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,818 $0 Implemented
OR0432 # 02 Y:2003 02 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $25,900 $32,000 Implemented
OR0432 # 03 Y:2003 03 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,830 $1,200 Implemented
OR0432 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,230 $7,640 Implemented
TA0059 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,885 $7,671 Implemented