IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,310

matching recommendations
Reset
SIC 367 Electronic Components And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0342 # 06 Y:1999 06 1999 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $261 $40 Implemented
AM0342 # 07 Y:1999 07 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $170 $250 Not Implemented
DS0127 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,707 $13,320 Implemented
DS0127 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $330 $300 Implemented
DS0127 # 03 Y:1999 03 1999 INSULATE BARE EQUIPMENT $883 $692 Not Implemented
DS0127 # 04 Y:1999 04 1999 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,048 $38 Not Implemented
DS0127 # 05 Y:1999 05 1999 MINIMIZE WATER USAGE $655 $520 Not Implemented
DS0127 # 06 Y:1999 06 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $7,045 $20,000 Not Implemented
MA0428 # 01 Y:1998 01 1998 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $1,280 $2,110 Not Implemented
MA0428 # 02 Y:1998 02 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $642 $30 Implemented
MA0428 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $3,142 $980 Implemented
MA0428 # 04 Y:1998 04 1998 IMPROVE SPACE COMFORT CONDITIONING $5,656 $11,874 Not Implemented
MA0428 # 05 Y:1998 05 1998 ADOPT IN-HOUSE MATERIAL GENERATION $5,618 $29,750 Not Implemented
OR0335 # 01 Y:1998 01 1998 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $347,930 $644,800 Not Implemented
OR0335 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,045 $1,000 Implemented
OR0335 # 03 Y:1998 03 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,260 $0 Not Implemented
OR0335 # 04 Y:1998 04 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $310 $0 Implemented
OR0330 # 01 Y:1998 01 1998 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $335,710 $438,500 Not Implemented
OR0330 # 02 Y:1998 02 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $4,900 $0 Implemented
OR0330 # 03 Y:1998 03 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $690 $0 Not Implemented
OR0330 # 04 Y:1998 04 1998 UTILIZE A LESS EXPENSIVE COOLING METHOD $163,740 $125,000 Not Implemented
OR0330 # 05 Y:1998 05 1998 OPTIMIZE PLANT POWER FACTOR $10,538 $14,800 Not Implemented
SF0149 # 01 Y:1998 01 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $690 $15 Implemented
SF0149 # 02 Y:1998 02 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $368 $0 Implemented
SF0149 # 03 Y:1998 03 1998 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $555 $495 Not Implemented