IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,199

matching recommendations
Reset
SIC 367 Electronic Components And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0184 # 02 Y:1997 02 1997 SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS $1,309 $0 Not Implemented
SD0184 # 03 Y:1997 03 1997 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $2,049 $2,500 Not Implemented
SD0184 # 04 Y:1997 04 1997 INSTALL TIMERS AND/OR THERMOSTATS $551 $150 Not Implemented
SD0184 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,528 $8,640 Not Implemented
SD0184 # 06 Y:1997 06 1997 INSTALL SPECTRAL REFLECTORS / DELAMP $15,269 $18,810 Not Implemented
SD0184 # 07 Y:1997 07 1997 CONVERT TO LESS TOXIC HYDROCARBON CLEANERS $6,500 $0 Implemented
SD0184 # 08 Y:1997 08 1997 USE SYNTHETIC LUBRICANT $2,877 $0 Implemented
SD0184 # 09 Y:1997 09 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $40,000 $150,000 Not Implemented
ME0224 # 01 Y:1997 01 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $47,583 $18,145 Implemented
ME0224 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,674 $5,557 Implemented
ME0224 # 03 Y:1997 03 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $4,198 $1,666 Not Implemented
ME0224 # 04 Y:1997 04 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,967 $650 Not Implemented
ME0224 # 05 Y:1997 05 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $3,067 $279 Implemented
ME0224 # 06 Y:1997 06 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $965 $250 Implemented
ME0224 # 07 Y:1997 07 1997 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT $3,640 $5,000 Implemented
ME0224 # 08 Y:1997 08 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,760 $0 Implemented
ME0224 # 09 Y:1997 09 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $214 $1,850 Implemented
MA0394 # 01 Y:1997 01 1997 CLEAR AND RENT EXISTING SPACE $262,500 $0 Implemented
MA0394 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $89,097 $320,340 Implemented
MA0394 # 03 Y:1997 03 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,317 $24,908 Not Implemented
MA0394 # 04 Y:1997 04 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,246 $4,225 Not Implemented
MA0394 # 05 Y:1997 05 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,330 $271 Implemented
MA0394 # 06 Y:1997 06 1997 USE A DIFFERENT OR RECYCLED RAW MATERIAL $1,120 $0 Not Implemented
SD0177 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,578 $9,930 Implemented
SD0177 # 02 Y:1997 02 1997 REPLACE BOILER $19,420 $83,000 Not Implemented