Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,152
matching recommendationsSIC | 3679 | Electronic Components, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0214 # 04 Y:1999 | 04 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $38,175 | $12,000 | Not Implemented |
SD0214 # 05 Y:1999 | 05 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $800 | $0 | Implemented |
SD0214 # 06 Y:1999 | 06 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $2,832 | $1,000 | Implemented |
SD0214 # 07 Y:1999 | 07 | 1999 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $3,600 | $2,300 | Implemented |
SD0214 # 08 Y:1999 | 08 | 1999 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $86,788 | $60,000 | Not Implemented |
DS0127 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,707 | $13,320 | Implemented |
DS0127 # 02 Y:1999 | 02 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $330 | $300 | Implemented |
DS0127 # 03 Y:1999 | 03 | 1999 | INSULATE BARE EQUIPMENT | $883 | $692 | Not Implemented |
DS0127 # 04 Y:1999 | 04 | 1999 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $1,048 | $38 | Not Implemented |
DS0127 # 05 Y:1999 | 05 | 1999 | MINIMIZE WATER USAGE | $655 | $520 | Not Implemented |
DS0127 # 06 Y:1999 | 06 | 1999 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $7,045 | $20,000 | Not Implemented |
MA0428 # 01 Y:1998 | 01 | 1998 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $1,280 | $2,110 | Not Implemented |
MA0428 # 02 Y:1998 | 02 | 1998 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $642 | $30 | Implemented |
MA0428 # 03 Y:1998 | 03 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,142 | $980 | Implemented |
MA0428 # 04 Y:1998 | 04 | 1998 | IMPROVE SPACE COMFORT CONDITIONING | $5,656 | $11,874 | Not Implemented |
MA0428 # 05 Y:1998 | 05 | 1998 | ADOPT IN-HOUSE MATERIAL GENERATION | $5,618 | $29,750 | Not Implemented |
OR0330 # 01 Y:1998 | 01 | 1998 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $335,710 | $438,500 | Not Implemented |
OR0330 # 02 Y:1998 | 02 | 1998 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,900 | $0 | Implemented |
OR0330 # 03 Y:1998 | 03 | 1998 | TURN OFF EQUIPMENT WHEN NOT IN USE | $690 | $0 | Not Implemented |
OR0330 # 04 Y:1998 | 04 | 1998 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $163,740 | $125,000 | Not Implemented |
OR0330 # 05 Y:1998 | 05 | 1998 | OPTIMIZE PLANT POWER FACTOR | $10,538 | $14,800 | Not Implemented |
CO0424 # 01 Y:1998 | 01 | 1998 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,580 | $1,000 | Not Implemented |
CO0424 # 02 Y:1998 | 02 | 1998 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $5,030 | $450 | Not Implemented |
AS0228 # 01 Y:1998 | 01 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $244,239 | $410,200 | Implemented |
AS0228 # 02 Y:1998 | 02 | 1998 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $955,252 | $4,000,000 | Not Implemented |