IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

65

matching recommendations
Reset
SIC 3692 Primary Batteries, Dry And Wet
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0624 # 12 Y:2007 12 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,045 $5,670 Implemented
MA0624 # 05 Y:2007 05 2007 IMPROVE COMBUSTION CONTROL CAPABILITY $12,255 $75,000 Implemented
MA0624 # 04 Y:2007 04 2007 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $14,298 $11,500 Implemented
MA0624 # 03 Y:2007 03 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $24,012 $50,000 Implemented
MA0624 # 01 Y:2007 01 2007 REPAIR OR REPLACE STEAM TRAPS $62,300 $24,500 Implemented
MA0624 # 06 Y:2007 06 2007 USE DEMAND CONTROLLER OR LOAD SHEDDER $11,448 $2,500 Implemented
MA0624 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,741 $0 Implemented
MA0624 # 08 Y:2007 08 2007 RECOVER WASTE HEAT FROM EQUIPMENT $4,655 $4,000 Implemented
MA0624 # 10 Y:2007 10 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $4,007 $12,000 Implemented
NC0165 # 02 Y:1999 02 1999 RECOVER WASTE HEAT FROM EQUIPMENT $4,539 $1,500 Implemented
NC0165 # 03 Y:1999 03 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $151,290 $29,000 Implemented
NC0165 # 05 Y:1999 05 1999 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT $824,740 $836,000 Implemented
NC0165 # 01 Y:1999 01 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $28,720 $10,000 Implemented
UD0576 # 03 Y:1999 03 1999 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $10,377 $4,700 Implemented
UD0576 # 06 Y:1999 06 1999 USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER $1,407 $1,000 Implemented
HO0192 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $409 $1,120 Implemented
HO0192 # 04 Y:1999 04 1999 INSULATE BARE EQUIPMENT $2,083 $520 Implemented
HO0192 # 05 Y:1999 05 1999 INSTALL REPLACEMENT DOORS $562 $700 Implemented
HO0192 # 06 Y:1999 06 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $960 $600 Implemented
HO0192 # 10 Y:1999 10 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $5,000 $1,000 Implemented
GT0557 # 02 Y:1995 02 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $910 $0 Implemented
GT0557 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,320 $58,400 Implemented
GT0557 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,600 $2,270 Implemented
GT0557 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,590 $23,400 Implemented
IA0113 # 05 Y:1995 05 1995 INSTALL OCCUPANCY SENSORS $806 $1,370 Implemented