IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,217

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NV0030 # 05 Y:1995 05 1995 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $963 $0 Implemented
UF0118 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,741 $23,485 Implemented
UF0118 # 04 Y:1995 04 1995 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,198 $4,450 Implemented
UF0118 # 07 Y:1995 07 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,350 $5,610 Implemented
UF0118 # 08 Y:1995 08 1995 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $8,112 $0 Implemented
ND0209 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,079 $1,200 Implemented
ND0209 # 03 Y:1995 03 1995 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,016 $490 Implemented
ND0209 # 06 Y:1995 06 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,749 $7,975 Implemented
IA0111 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,777 $9,655 Implemented
IA0111 # 05 Y:1995 05 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,029 $500 Implemented
IA0111 # 08 Y:1995 08 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,672 $8,000 Implemented
AS0144 # 01 Y:1995 01 1995 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $42,045 $63,900 Implemented
AS0144 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,451 $5,634 Implemented
AS0144 # 04 Y:1995 04 1995 USE SYNTHETIC LUBRICANT $1,119 $1,380 Implemented
AS0144 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $704 $0 Implemented
AS0144 # 06 Y:1995 06 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $358 $1,305 Implemented
UD0458 # 01 Y:1995 01 1995 OPTIMIZE PLANT POWER FACTOR $11,292 $25,000 Implemented
UD0458 # 03 Y:1995 03 1995 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $23,747 $5,000 Implemented
UD0458 # 04 Y:1995 04 1995 RECOVER WASTE HEAT FROM EQUIPMENT $12,040 $30,000 Implemented
UD0458 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,553 $23,127 Implemented
UD0458 # 06 Y:1995 06 1995 KEEP LAMPS AND REFLECTORS CLEAN $2,914 $1,680 Implemented
UD0458 # 08 Y:1995 08 1995 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $4,442 $600 Implemented
SD0114 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,611 $2,460 Implemented
SD0114 # 03 Y:1995 03 1995 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $14,005 $0 Implemented
SD0114 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,443 $360 Implemented