IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,221

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0822 # 08 Y:2012 08 2012 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $16,463 $26,358 Implemented
OK0822 # 09 Y:2012 09 2012 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,814 $40,395 Implemented
MA0687 # 03 Y:2012 03 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,724 $45,500 Implemented
MA0687 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,857 $9,000 Implemented
MA0687 # 06 Y:2012 06 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,065 $11,500 Implemented
UA0074 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,718 $480 Implemented
UA0074 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,736 $2,500 Implemented
UA0074 # 07 Y:2012 07 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,847 $2 Implemented
IA0475 # 01 Y:2012 01 2012 INSTALL OCCUPANCY SENSORS $1,055 $1,160 Implemented
IA0475 # 02 Y:2012 02 2012 INSTALL SPECTRAL REFLECTORS / DELAMP $1,377 $235 Implemented
IA0475 # 05 Y:2012 05 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $960 $433 Implemented
MA0685 # 03 Y:2011 03 2011 OPTIMIZE PLANT POWER FACTOR $3,520 $9,425 Implemented
MA0685 # 04 Y:2011 04 2011 REDUCE VENTILATION AIR $2,713 $6,300 Implemented
UA0071 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $2,105 $2,719 Implemented
UA0071 # 03 Y:2011 03 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $31,348 $0 Implemented
UA0069 # 09 Y:2011 09 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,865 $24,690 Implemented
DL0079 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,495 $36,850 Implemented
DL0079 # 03 Y:2011 03 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $12,737 $100 Implemented
DL0079 # 04 Y:2011 04 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,364 $1,015 Implemented
DL0079 # 05 Y:2011 05 2011 RECOVER WASTE HEAT FROM EQUIPMENT $7,317 $350 Implemented
DL0079 # 08 Y:2011 08 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $464 $105 Implemented
NC0436 # 03 Y:2011 03 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $18,076 $4,000 Implemented
NC0436 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,560 $100 Implemented
NC0436 # 06 Y:2011 06 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $12,954 $6,435 Implemented
NC0436 # 08 Y:2011 08 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,009 $1,000 Implemented