Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,732
matching recommendationsSIC | 37 | Transportation Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0157 # 12 Y:1999 | 12 | 1999 | PAY UTILITY BILLS ON TIME | $328 | $0 | Implemented |
WV0157 # 13 Y:1999 | 13 | 1999 | USE EVAPORATION TO CONCENTRATE MATERIAL | $7,217 | $4,265 | Not Implemented |
WV0157 # 14 Y:1999 | 14 | 1999 | UTILIZE OUTSIDE CONTRACTING | $14,816 | $0 | Implemented |
WV0157 # 15 Y:1999 | 15 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $146,629 | $250,000 | Not Implemented |
WV0157 # 16 Y:1999 | 16 | 1999 | CHANGE OPERATING CONDITIONS | $2,437 | $0 | Not Implemented |
SD0213 # 01 Y:1999 | 01 | 1999 | INSTALL SPECTRAL REFLECTORS / DELAMP | $2,397 | $1,830 | Implemented |
SD0213 # 02 Y:1999 | 02 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,603 | $5,830 | Implemented |
SD0213 # 03 Y:1999 | 03 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,133 | $0 | Implemented |
SD0213 # 04 Y:1999 | 04 | 1999 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,873 | $500 | Implemented |
SD0213 # 05 Y:1999 | 05 | 1999 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $5,948 | $8,500 | Not Implemented |
SD0213 # 06 Y:1999 | 06 | 1999 | REDESIGN PROCESS | $28,000 | $20,000 | Not Implemented |
SD0213 # 07 Y:1999 | 07 | 1999 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $2,400 | $600 | Not Implemented |
GT0653 # 01 Y:1998 | 01 | 1998 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,720 | $2,000 | Not Implemented |
GT0653 # 02 Y:1998 | 02 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,810 | $600 | Implemented |
GT0653 # 03 Y:1998 | 03 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $647 | $420 | Not Implemented |
GT0653 # 04 Y:1998 | 04 | 1998 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $384 | $0 | Implemented |
GT0653 # 05 Y:1998 | 05 | 1998 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $865 | $0 | Not Implemented |
GT0653 # 06 Y:1998 | 06 | 1998 | UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID | $8,980 | $31,660 | Implemented |
GT0653 # 07 Y:1998 | 07 | 1998 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $370,000 | $100,000 | Implemented |
TN0645 # 01 Y:1998 | 01 | 1998 | ALLOW DRAINAGE BEFORE WITHDRAWING OBJECT | $408,630 | $24,685 | Implemented |
TN0645 # 02 Y:1998 | 02 | 1998 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $277,345 | $644,800 | Not Implemented |
TN0645 # 03 Y:1998 | 03 | 1998 | REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS | $237,600 | $153,485 | Not Implemented |
TN0645 # 04 Y:1998 | 04 | 1998 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $221,455 | $70,000 | Not Implemented |
TN0645 # 05 Y:1998 | 05 | 1998 | INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION | $198,225 | $250,000 | Not Implemented |
TN0645 # 06 Y:1998 | 06 | 1998 | USE A DIFFERENT OR RECYCLED RAW MATERIAL | $51,945 | $200,000 | Not Implemented |