Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
182
matching recommendationsSIC | 37 | Transportation Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0106 # 01 Y:2006 | 01 | 2006 | OPTIMIZE PLANT POWER FACTOR | $19,900 | $40,020 | Not Implemented |
UU0106 # 02 Y:2006 | 02 | 2006 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $43,630 | $20,000 | Not Implemented |
UU0106 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,510 | $3,780 | Not Implemented |
UU0106 # 04 Y:2006 | 04 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,120 | $4,000 | Not Implemented |
UU0106 # 05 Y:2006 | 05 | 2006 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $23,010 | $7,390 | Not Implemented |
UU0106 # 06 Y:2006 | 06 | 2006 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $590 | $500 | Not Implemented |
UU0082 # 01 Y:2005 | 01 | 2005 | USE CORRECT SIZE STEAM TRAPS | $32,790 | $20,000 | Not Implemented |
UU0082 # 02 Y:2005 | 02 | 2005 | SHUT OFF STEAM TRAPS ON SUPER HEATED STEAM LINES WHEN NOT IN USE | $36,280 | $0 | Not Implemented |
UU0082 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $784 | $4,300 | Not Implemented |
UU0082 # 04 Y:2005 | 04 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $786 | $600 | Not Implemented |
UU0082 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,720 | $540 | Not Implemented |
UU0086 # 01 Y:2005 | 01 | 2005 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $8,056 | $12,620 | Not Implemented |
UU0086 # 02 Y:2005 | 02 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,984 | $6,400 | Not Implemented |
UU0086 # 03 Y:2005 | 03 | 2005 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $17,445 | $3,600 | Not Implemented |
UU0086 # 04 Y:2005 | 04 | 2005 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,447 | $21,000 | Not Implemented |
UU0086 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $773 | $4,320 | Not Implemented |
UU0086 # 06 Y:2005 | 06 | 2005 | OPTIMIZE PLANT POWER FACTOR | $15,260 | $14,000 | Not Implemented |
UU0068 # 01 Y:2004 | 01 | 2004 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $21,193 | $325 | Implemented |
UU0068 # 02 Y:2004 | 02 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,711 | $3,315 | Not Implemented |
UU0068 # 03 Y:2004 | 03 | 2004 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $5,381 | $7,500 | Not Implemented |
UU0068 # 04 Y:2004 | 04 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,006 | $8,929 | Not Implemented |
UU0068 # 05 Y:2004 | 05 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,004 | $244 | Implemented |
UU0068 # 06 Y:2004 | 06 | 2004 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $12,376 | $1,292 | Implemented |
UU0066 # 01 Y:2004 | 01 | 2004 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $2,690 | $3,000 | Not Implemented |
UU0066 # 02 Y:2004 | 02 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $340 | $200 | Not Implemented |