IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,376

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0356 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $519 $415 Implemented
MZ0356 # 05 Y:2023 05 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,120 $2,680 Implemented
MZ0356 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,117 $14,802 Implemented
MU0040 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $213 $315 Implemented
MU0040 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,004 $41 Implemented
AS0564 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN WATER LINES AND VALVES $29 $79 Implemented
AS0564 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,294 $1,654 Implemented
AS0564 # 03 Y:2023 03 2023 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,752 $63 Implemented
AS0564 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,251 $143 Implemented
UL2309 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,637 $0 Implemented
UL2309 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,370 $18,360 Implemented
UL2309 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,305 $2,688 Implemented
UL2309 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $957 $1,596 Implemented
WV0649 # 11 Y:2023 11 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,381 $528 Implemented
WV0649 # 08 Y:2023 08 2023 DEVELOP A REPAIR/REPLACE POLICY $6,156 $1,439 Implemented
WV0649 # 01 Y:2023 01 2023 INSULATE BARE EQUIPMENT $19,114 $9,160 Implemented
WV0649 # 05 Y:2023 05 2023 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $9,620 $1,500 Implemented
WV0649 # 14 Y:2023 14 2023 INSTALL OCCUPANCY SENSORS $283 $608 Implemented
WV0649 # 07 Y:2023 07 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,255 $3,000 Implemented
WV0649 # 10 Y:2023 10 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,665 $407 Implemented
WV0649 # 09 Y:2023 09 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,697 $13,390 Implemented
GT0968 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $104,725 $13,000 Implemented
GT0968 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $73,640 $23,680 Implemented
GT0968 # 04 Y:2023 04 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $3,052 $3,250 Implemented
GT0968 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $64,657 $1,850 Implemented