IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,376

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0286 # 09 Y:2005 09 2005 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $100 $45 Implemented
UM0284 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $32,977 $1,275 Implemented
UM0284 # 03 Y:2005 03 2005 RECOVER WASTE HEAT FROM EQUIPMENT $7,059 $1,000 Implemented
UM0284 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,062 $4,152 Implemented
UM0284 # 05 Y:2005 05 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,954 $2,000 Implemented
MA0579 # 01 Y:2005 01 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,816 $7,000 Implemented
MA0579 # 04 Y:2005 04 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,893 $4,197 Implemented
MA0579 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,427 $7,389 Implemented
MA0579 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,484 $450 Implemented
MA0579 # 08 Y:2005 08 2005 INSULATE BARE EQUIPMENT $647 $1,170 Implemented
MA0578 # 01 Y:2005 01 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $86,353 $20,000 Implemented
MA0578 # 03 Y:2005 03 2005 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,767 $25,000 Implemented
MA0578 # 05 Y:2005 05 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,718 $5,475 Implemented
MA0578 # 06 Y:2005 06 2005 IMPROVE COMBUSTION CONTROL CAPABILITY $36,304 $600 Implemented
UM0281 # 01 Y:2005 01 2005 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,337 $300 Implemented
UM0281 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,591 $3,891 Implemented
UM0281 # 03 Y:2005 03 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,961 $75 Implemented
UM0281 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,214 $75 Implemented
UM0281 # 05 Y:2005 05 2005 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $125 $100 Implemented
LM0098 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,551 $700 Implemented
LM0098 # 04 Y:2005 04 2005 INSTALL SENSORS TO DETECT DEFECTS $94,133 $49,500 Implemented
LM0098 # 05 Y:2005 05 2005 DEVELOP STANDARD OPERATING PROCEDURES $216,000 $11,800 Implemented
WI0487 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,912 $11,200 Implemented
WI0487 # 02 Y:2005 02 2005 INSTALL SPECTRAL REFLECTORS / DELAMP $933 $0 Implemented
WI0487 # 03 Y:2005 03 2005 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $5,262 $5,600 Implemented