IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

239

matching recommendations
Reset
SIC 3713 Truck And Bus Bodies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0564 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN WATER LINES AND VALVES $29 $79 Implemented
AS0564 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,251 $143 Implemented
AS0564 # 03 Y:2023 03 2023 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,752 $63 Implemented
AS0564 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,294 $1,654 Implemented
GT0968 # 04 Y:2023 04 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $3,052 $3,250 Implemented
GT0968 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $73,640 $23,680 Implemented
GT0968 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $64,657 $1,850 Implemented
GT0968 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $104,725 $13,000 Implemented
TT0293 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,707 $1,500 Implemented
TT0293 # 09 Y:2023 09 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $630 $2,000 Implemented
TT0293 # 06 Y:2023 06 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,199 $0 Implemented
TT0293 # 08 Y:2023 08 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $736 $170 Implemented
TT0293 # 03 Y:2023 03 2023 UPGRADE CONTROLS ON COMPRESSORS $7,910 $600 Implemented
TT0293 # 04 Y:2023 04 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,615 $31,320 Implemented
TT0293 # 07 Y:2023 07 2023 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $923 $1,600 Implemented
TT0293 # 02 Y:2023 02 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $10,120 $0 Implemented
UA0255 # 01 Y:2022 01 2022 USE RADIANT HEATER FOR SPOT HEATING $10,422 $17,285 Implemented
UA0255 # 03 Y:2022 03 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,186 $500 Implemented
UA0255 # 05 Y:2022 05 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $123 $231 Implemented
UA0255 # 02 Y:2022 02 2022 INSTALL TIMERS AND/OR THERMOSTATS $960 $850 Implemented
WV0620 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,233 $660 Implemented
WV0620 # 07 Y:2022 07 2022 OPTIMIZE PLANT POWER FACTOR $2,785 $7,090 Implemented
WV0620 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,394 $7,905 Implemented
UU0186 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $822 $1,645 Implemented
UU0186 # 05 Y:2021 05 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $544 $200 Implemented