IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,792

matching recommendations
Reset
SIC 3714 Motor Vehicle Parts And Accessories
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0074 # 09 Y:1995 09 1995 TURN OFF EQUIPMENT WHEN NOT IN USE $2,696 $200 Implemented
AR0074 # 10 Y:1995 10 1995 MAINTAIN MACHINES TO REDUCE LEAKS $3,240 $1,000 Implemented
UF0131 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,967 $13,352 Implemented
UF0131 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,115 $14,659 Implemented
UF0131 # 08 Y:1995 08 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $845 $350 Implemented
UF0131 # 10 Y:1995 10 1995 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $85,495 $8,000 Implemented
BD0039 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,365 $16,630 Implemented
BD0039 # 02 Y:1995 02 1995 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $3,955 $2,000 Implemented
BD0039 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,953 $1,000 Implemented
BD0039 # 04 Y:1995 04 1995 INSTALL OCCUPANCY SENSORS $3,985 $825 Implemented
BD0039 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $723 $571 Implemented
BD0039 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $182 $305 Implemented
WV0075 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,706 $855 Implemented
WV0075 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,349 $22,310 Implemented
WV0075 # 03 Y:1995 03 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $493 $600 Implemented
WV0075 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,783 $250 Implemented
WV0075 # 09 Y:1995 09 1995 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $10,573 $4,300 Implemented
WV0075 # 12 Y:1995 12 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $323 $415 Implemented
WV0075 # 13 Y:1995 13 1995 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,415 $480 Implemented
UD0468 # 03 Y:1995 03 1995 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,738 $1,000 Implemented
UD0468 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,406 $30,850 Implemented
UD0468 # 05 Y:1995 05 1995 DISCONNECT BALLASTS $3,368 $3,000 Implemented
BD0034 # 01 Y:1995 01 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $36,269 $34,000 Implemented
AR0064 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,704 $500 Implemented
AR0064 # 02 Y:1995 02 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $694 $1,000 Implemented