Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
62
matching recommendationsSIC | 372 | Aircraft And Parts |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0512 # 01 Y:2006 | 01 | 2006 | INSTALL OCCUPANCY SENSORS | $100,600 | $5,500 | Implemented |
TA0131 # 01 Y:2006 | 01 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $18,180 | $16 | Implemented |
TA0131 # 03 Y:2006 | 03 | 2006 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $4,180 | $630 | Not Implemented |
TA0131 # 02 Y:2006 | 02 | 2006 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $9,225 | $60 | Not Implemented |
TA0131 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,450 | $120 | Implemented |
TA0131 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,400 | $0 | Implemented |
OR0512 # 03 Y:2006 | 03 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $7,000 | $5,000 | Implemented |
OR0512 # 02 Y:2006 | 02 | 2006 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $32,700 | $20,600 | Not Implemented |
OR0512 # 05 Y:2006 | 05 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $4,400 | $7,500 | Implemented |
OR0512 # 04 Y:2006 | 04 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,300 | $5,000 | Implemented |
MS0304 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $289,291 | $222,009 | Implemented |
MS0304 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $118,243 | $1,820 | Implemented |
MS0304 # 03 Y:2006 | 03 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,366 | $16,063 | Implemented |
MS0304 # 04 Y:2006 | 04 | 2006 | USE SYNTHETIC LUBRICANT | $7,010 | $153 | Implemented |
UU0106 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,510 | $3,780 | Not Implemented |
UU0106 # 05 Y:2006 | 05 | 2006 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $23,010 | $7,390 | Not Implemented |
UU0106 # 04 Y:2006 | 04 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,120 | $4,000 | Not Implemented |
UU0106 # 02 Y:2006 | 02 | 2006 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $43,630 | $20,000 | Not Implemented |
UU0106 # 01 Y:2006 | 01 | 2006 | OPTIMIZE PLANT POWER FACTOR | $19,900 | $40,020 | Not Implemented |
UU0106 # 06 Y:2006 | 06 | 2006 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $590 | $500 | Not Implemented |
MA0607 # 06 Y:2006 | 06 | 2006 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $10,577 | $1,870 | Not Implemented |
MA0607 # 07 Y:2006 | 07 | 2006 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $6,860 | $3,500 | Not Implemented |
MA0607 # 01 Y:2006 | 01 | 2006 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $46,963 | $0 | Not Implemented |
MA0607 # 02 Y:2006 | 02 | 2006 | REDUCE VENTILATION AIR | $45,943 | $10,400 | Not Implemented |
MA0607 # 05 Y:2006 | 05 | 2006 | USE UTILITY CONTROLLED POWER MANAGEMENT | $12,223 | $14,000 | Not Implemented |