Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
51
matching recommendationsSIC | 3724 | Aircraft Engines And Engine Parts |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0740 # 07 Y:2015 | 07 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,652 | $5,375 | Not Implemented |
MA0737 # 02 Y:2014 | 02 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,120 | $8,225 | Implemented |
MA0737 # 04 Y:2014 | 04 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $551 | $1,688 | Implemented |
MA0737 # 03 Y:2014 | 03 | 2014 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $1,931 | $4,020 | Not Implemented |
MA0737 # 01 Y:2014 | 01 | 2014 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $11,551 | $200 | Implemented |
MAS026 # 05 Y:2012 | 05 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,426 | $0 | Not Implemented |
MAS026 # 01 Y:2012 | 01 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $24,352 | $59,500 | Not Implemented |
MAS026 # 02 Y:2012 | 02 | 2012 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $15,819 | $17,200 | Not Implemented |
MAS026 # 03 Y:2012 | 03 | 2012 | REDUCE VENTILATION AIR | $14,331 | $8,000 | Not Implemented |
MAS026 # 04 Y:2012 | 04 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $10,915 | $5,000 | Not Implemented |
MA0685 # 05 Y:2011 | 05 | 2011 | INSTALL OCCUPANCY SENSORS | $898 | $1,280 | Not Implemented |
MA0685 # 04 Y:2011 | 04 | 2011 | REDUCE VENTILATION AIR | $2,713 | $6,300 | Implemented |
MA0685 # 03 Y:2011 | 03 | 2011 | OPTIMIZE PLANT POWER FACTOR | $3,520 | $9,425 | Implemented |
MA0685 # 02 Y:2011 | 02 | 2011 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,714 | $0 | Not Implemented |
MA0685 # 01 Y:2011 | 01 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,634 | $7,050 | Not Implemented |
MA0519 # 05 Y:2002 | 05 | 2002 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,240 | $500 | Implemented |
MA0519 # 04 Y:2002 | 04 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,344 | $450 | Implemented |
MA0519 # 03 Y:2002 | 03 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,294 | $6,675 | Not Implemented |
MA0519 # 02 Y:2002 | 02 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $17,181 | $2,500 | Not Implemented |
MA0519 # 01 Y:2002 | 01 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $28,771 | $13,775 | Not Implemented |
MA0277 # 06 Y:1993 | 06 | 1993 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $550 | $126 | Not Implemented |
MA0277 # 05 Y:1993 | 05 | 1993 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $784 | $180 | Implemented |
MA0277 # 04 Y:1993 | 04 | 1993 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,397 | $91 | Implemented |
MA0277 # 03 Y:1993 | 03 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,443 | $5,557 | Implemented |
MA0277 # 02 Y:1993 | 02 | 1993 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $5,123 | $3,800 | Implemented |