IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

105

matching recommendations
Reset
SIC 374 Railroad Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0129 # 01 Y:2013 01 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $56,550 $18,200 Implemented
MZ0129 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,580 $267,500 Implemented
MZ0129 # 08 Y:2013 08 2013 INSTALL OCCUPANCY SENSORS $998 $190 Implemented
MZ0129 # 11 Y:2013 11 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,450 $0 Implemented
WV0451 # 08 Y:2012 08 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,273 $10,200 Implemented
WV0451 # 06 Y:2012 06 2012 INSULATE BARE EQUIPMENT $3,732 $1,737 Implemented
WV0451 # 16 Y:2012 16 2012 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $783 $70 Implemented
WV0451 # 13 Y:2012 13 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,600 $2,500 Implemented
WV0451 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,858 $380 Implemented
WV0451 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,062 $5,773 Implemented
SF0377 # 01 Y:2009 01 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,324 $0 Implemented
LE0281 # 04 Y:2008 04 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,441 $2,500 Implemented
LE0281 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $923 $240 Implemented
LE0281 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,477 $1,790 Implemented
UD0707 # 02 Y:2004 02 2004 COVER OPEN TANKS $27,270 $4,326 Implemented
UD0707 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $1,158 $245 Implemented
UD0707 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,956 $31,342 Implemented
CO0550 # 11 Y:2004 11 2004 $390 $0 Implemented
CO0550 # 10 Y:2004 10 2004 ADD AREA LIGHTING SWITCHES $2,070 $4,850 Implemented
CO0550 # 08 Y:2004 08 2004 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,570 $1,000 Implemented
CO0550 # 04 Y:2004 04 2004 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $590 $3,520 Implemented
CO0550 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,000 $180 Implemented
CO0550 # 01 Y:2004 01 2004 RECOVER WASTE HEAT FROM EQUIPMENT $1,960 $2,000 Implemented
SU0134 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,420 $89 Implemented
SU0134 # 07 Y:2002 07 2002 INSTALL OCCUPANCY SENSORS $1,453 $299 Implemented