Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28
matching recommendationsSIC | 375 | Motorcycles, Bicycles, And Parts |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0016 # 01 Y:2013 | 01 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,083 | $0 | Implemented |
IP0016 # 04 Y:2013 | 04 | 2013 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $7,284 | $1,400 | Implemented |
IP0016 # 08 Y:2013 | 08 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,271 | $1,400 | Implemented |
NC0472 # 05 Y:2012 | 05 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $24 | $0 | Implemented |
NC0472 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $188 | $50 | Implemented |
NC0472 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,563 | $16,950 | Implemented |
NC0338 # 03 Y:2006 | 03 | 2006 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $2,391 | $2,500 | Implemented |
NC0338 # 04 Y:2006 | 04 | 2006 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $20,374 | $75,000 | Implemented |
NC0338 # 05 Y:2006 | 05 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,416 | $16,843 | Implemented |
NC0338 # 06 Y:2006 | 06 | 2006 | COVER OPEN TANKS | $1,097 | $1,600 | Implemented |
NC0338 # 01 Y:2006 | 01 | 2006 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $63,286 | $175,000 | Implemented |
LM0060 # 14 Y:2003 | 14 | 2003 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $37,800 | $20,000 | Implemented |
LM0060 # 15 Y:2003 | 15 | 2003 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $112,500 | $8,120 | Implemented |
LM0060 # 11 Y:2003 | 11 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,936 | $2,088 | Implemented |
LM0060 # 10 Y:2003 | 10 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,416 | $14,328 | Implemented |
LM0060 # 09 Y:2003 | 09 | 2003 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,049 | $100 | Implemented |
LM0060 # 05 Y:2003 | 05 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $12,820 | $650 | Implemented |
LM0060 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,131 | $100 | Implemented |
TA0045 # 07 Y:2003 | 07 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $215 | $445 | Implemented |
TA0045 # 05 Y:2003 | 05 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $370 | $0 | Implemented |
TA0045 # 01 Y:2003 | 01 | 2003 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $27,670 | $800 | Implemented |
TA0045 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,140 | $200 | Implemented |
TA0045 # 03 Y:2003 | 03 | 2003 | PAY UTILITY BILLS ON TIME | $1,990 | $0 | Implemented |
TA0045 # 04 Y:2003 | 04 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,740 | $3,230 | Implemented |
NV0058 # 04 Y:1996 | 04 | 1996 | INSTALL OCCUPANCY SENSORS | $1,338 | $227 | Implemented |