IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 375 Motorcycles, Bicycles, And Parts
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0016 # 01 Y:2013 01 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,083 $0 Implemented
IP0016 # 04 Y:2013 04 2013 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $7,284 $1,400 Implemented
IP0016 # 08 Y:2013 08 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,271 $1,400 Implemented
NC0472 # 05 Y:2012 05 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $24 $0 Implemented
NC0472 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $188 $50 Implemented
NC0472 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,563 $16,950 Implemented
NC0338 # 03 Y:2006 03 2006 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,391 $2,500 Implemented
NC0338 # 04 Y:2006 04 2006 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $20,374 $75,000 Implemented
NC0338 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,416 $16,843 Implemented
NC0338 # 06 Y:2006 06 2006 COVER OPEN TANKS $1,097 $1,600 Implemented
NC0338 # 01 Y:2006 01 2006 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $63,286 $175,000 Implemented
LM0060 # 14 Y:2003 14 2003 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $37,800 $20,000 Implemented
LM0060 # 15 Y:2003 15 2003 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $112,500 $8,120 Implemented
LM0060 # 11 Y:2003 11 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,936 $2,088 Implemented
LM0060 # 10 Y:2003 10 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,416 $14,328 Implemented
LM0060 # 09 Y:2003 09 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,049 $100 Implemented
LM0060 # 05 Y:2003 05 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,820 $650 Implemented
LM0060 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,131 $100 Implemented
TA0045 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $215 $445 Implemented
TA0045 # 05 Y:2003 05 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $370 $0 Implemented
TA0045 # 01 Y:2003 01 2003 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $27,670 $800 Implemented
TA0045 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,140 $200 Implemented
TA0045 # 03 Y:2003 03 2003 PAY UTILITY BILLS ON TIME $1,990 $0 Implemented
TA0045 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,740 $3,230 Implemented
NV0058 # 04 Y:1996 04 1996 INSTALL OCCUPANCY SENSORS $1,338 $227 Implemented