Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
66
matching recommendationsSIC | 376 | Guided Missiles, Space Vehicles, Parts |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0326 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,373 | $21,660 | Implemented |
LE0326 # 02 Y:2011 | 02 | 2011 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $10,236 | $51,475 | Implemented |
LE0326 # 03 Y:2011 | 03 | 2011 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $9,313 | $108 | Implemented |
LE0326 # 04 Y:2011 | 04 | 2011 | INSTALL TIMERS AND/OR THERMOSTATS | $6,020 | $95 | Implemented |
LE0326 # 05 Y:2011 | 05 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,890 | $10,580 | Implemented |
LE0326 # 06 Y:2011 | 06 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,255 | $1,000 | Implemented |
LE0326 # 08 Y:2011 | 08 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,956 | $25 | Implemented |
LE0326 # 09 Y:2011 | 09 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,818 | $1,000 | Implemented |
LE0326 # 11 Y:2011 | 11 | 2011 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $1,230 | $35,000 | Implemented |
BD0319 # 04 Y:2007 | 04 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,763 | $0 | Implemented |
BD0319 # 01 Y:2007 | 01 | 2007 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $21,538 | $875 | Implemented |
LM0102 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,202 | $500 | Implemented |
LM0102 # 03 Y:2005 | 03 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,712 | $200 | Implemented |
LM0102 # 02 Y:2005 | 02 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,058 | $1,000 | Implemented |
LM0102 # 05 Y:2005 | 05 | 2005 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $1,258,000 | $1,250,000 | Implemented |
MS0276 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,566 | $20,159 | Implemented |
MS0276 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,158 | $1,871 | Implemented |
TA0016 # 07 Y:2001 | 07 | 2001 | USE PHOTOCELL CONTROLS | $1,696 | $225 | Implemented |
TA0016 # 11 Y:2001 | 11 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $254 | $542 | Implemented |
TA0016 # 09 Y:2001 | 09 | 2001 | INSTALL OCCUPANCY SENSORS | $1,032 | $320 | Implemented |
TA0016 # 04 Y:2001 | 04 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,090 | $1,200 | Implemented |
TA0016 # 01 Y:2001 | 01 | 2001 | REPLACE BOILER | $420,482 | $9,456 | Implemented |
TA0016 # 03 Y:2001 | 03 | 2001 | INSULATE BARE EQUIPMENT | $13,585 | $2,910 | Implemented |
TA0016 # 02 Y:2001 | 02 | 2001 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $15,055 | $600 | Implemented |
TA0016 # 06 Y:2001 | 06 | 2001 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,920 | $54 | Implemented |