IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,909

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0154 # 08 Y:1996 08 1996 REPROCESS SPENT OILS ON SITE FOR RE-USE $9,000 $6,000 Implemented
SD0154 # 09 Y:1996 09 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $3,250 $4,000 Implemented
TN0588 # 01 Y:1996 01 1996 DISTILL CONTAMINATED SOLVENTS FOR REUSE $45,192 $51,320 Implemented
TN0588 # 03 Y:1996 03 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,760 $5,300 Implemented
TN0588 # 06 Y:1996 06 1996 INSTALL OCCUPANCY SENSORS $290 $845 Implemented
NC0095 # 01 Y:1996 01 1996 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,105 $5,000 Implemented
NC0095 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,473 $6,046 Implemented
NC0095 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $195 $90 Implemented
NC0081 # 01 Y:1996 01 1996 DISCONNECT BALLASTS $800 $2,060 Implemented
NC0081 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,438 $17,250 Implemented
NC0081 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,043 $53,739 Implemented
NC0081 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $558 $480 Implemented
NC0081 # 05 Y:1996 05 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,626 $2,640 Implemented
NC0081 # 06 Y:1996 06 1996 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $9,258 $25,000 Implemented
HO0131 # 04 Y:1996 04 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $962 $1,650 Implemented
SD0148 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,248 $2,380 Implemented
SD0148 # 02 Y:1996 02 1996 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $45,359 $5,823 Implemented
SD0148 # 03 Y:1996 03 1996 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $4,743 $450 Implemented
SD0148 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,027 $39,147 Implemented
SD0148 # 05 Y:1996 05 1996 INSTALL SPECTRAL REFLECTORS / DELAMP $2,679 $2,670 Implemented
SD0148 # 06 Y:1996 06 1996 INSTALL OCCUPANCY SENSORS $5,177 $2,429 Implemented
SD0148 # 07 Y:1996 07 1996 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $784 $1,450 Implemented
SD0148 # 08 Y:1996 08 1996 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $640 $0 Implemented
SD0135 # 01 Y:1996 01 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,152 $1,450 Implemented
SD0135 # 02 Y:1996 02 1996 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $3,735 $6,300 Implemented