IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,872

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0136 # 07 Y:1996 07 1996 INSTALL OCCUPANCY SENSORS $1,471 $1,001 Implemented
SD0136 # 08 Y:1996 08 1996 REDUCE SCRAP PRODUCTION $56,160 $0 Implemented
AM0265 # 01 Y:1996 01 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $3,100 $750 Implemented
AM0265 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,260 $760 Implemented
AM0265 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,550 $240 Implemented
AM0265 # 06 Y:1996 06 1996 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $200 $300 Implemented
MS0050 # 02 Y:1996 02 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,370 $1,882 Implemented
MS0050 # 04 Y:1996 04 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,300 $0 Implemented
UF0141 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,249 $2,934 Implemented
UF0141 # 03 Y:1996 03 1996 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $18,184 $13,550 Implemented
UF0141 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,365 $750 Implemented
UF0141 # 05 Y:1996 05 1996 USE SYNTHETIC LUBRICANT $945 $250 Implemented
SF0080 # 04 Y:1996 04 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,815 $13,397 Implemented
SF0080 # 05 Y:1996 05 1996 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $67 $100 Implemented
SF0080 # 06 Y:1996 06 1996 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,740 $9,900 Implemented
SF0080 # 10 Y:1996 10 1996 CONVERT TO AQUEOUS CLEANING SYSTEM $1,660 $5,561 Implemented
SF0076 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,142 $31,230 Implemented
SF0076 # 02 Y:1996 02 1996 INSTALL OCCUPANCY SENSORS $2,898 $5,940 Implemented
UF0137 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,664 $350 Implemented
UF0137 # 04 Y:1996 04 1996 RECOVER WASTE HEAT FROM EQUIPMENT $9,176 $14,000 Implemented
UF0137 # 06 Y:1996 06 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $21,580 $0 Implemented
UF0137 # 08 Y:1996 08 1996 METER WASTE WATER $1,788 $2,000 Implemented
DS0043 # 03 Y:1995 03 1995 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $16,954 $1,700 Implemented
CO0343 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,180 $2,680 Implemented
CO0343 # 05 Y:1995 05 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $980 $900 Implemented