Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,140
matching recommendationsSIC | 38 | Instruments And Related Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0684 # 02 Y:2000 | 02 | 2000 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $1,325 | $0 | Not Implemented |
GT0684 # 03 Y:2000 | 03 | 2000 | USE POWER DURING OFF-PEAK PERIODS | $1,975 | $0 | Not Implemented |
GT0684 # 04 Y:2000 | 04 | 2000 | CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS | $1,632 | $2,450 | Not Implemented |
GT0684 # 05 Y:2000 | 05 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,200 | $19,600 | Not Implemented |
MO0270 # 01 Y:1999 | 01 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $10,783 | $36,941 | Implemented |
MO0270 # 02 Y:1999 | 02 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,802 | $10,421 | Not Implemented |
MO0270 # 03 Y:1999 | 03 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $235 | $53 | Not Implemented |
MO0270 # 04 Y:1999 | 04 | 1999 | USE A DIFFERENT OR RECYCLED RAW MATERIAL | $720 | $1,800 | Not Implemented |
MO0270 # 05 Y:1999 | 05 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $76,792 | $0 | Not Implemented |
MO0270 # 06 Y:1999 | 06 | 1999 | CONSIDER THREE OR FOUR DAYS AROUND-THE-CLOCK OPERATION RATHER THAN ONE OR TWO SHIFTS PER DAY | $4,407 | $0 | Not Implemented |
MA0446 # 01 Y:1999 | 01 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $30,897 | $36,700 | Not Implemented |
MA0446 # 02 Y:1999 | 02 | 1999 | INSULATE BARE EQUIPMENT | $30,690 | $820 | Not Implemented |
MA0446 # 03 Y:1999 | 03 | 1999 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $14,463 | $20,800 | Implemented |
MA0446 # 04 Y:1999 | 04 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,237 | $3,575 | Implemented |
MA0446 # 05 Y:1999 | 05 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,234 | $12,279 | Not Implemented |
MA0446 # 06 Y:1999 | 06 | 1999 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $2,849 | $0 | Implemented |
MA0446 # 07 Y:1999 | 07 | 1999 | AIR CONDITION ONLY SPACE NECESSARY | $1,137 | $2,670 | Implemented |
MA0446 # 08 Y:1999 | 08 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $930 | $4,225 | Not Implemented |
MA0446 # 09 Y:1999 | 09 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $718 | $2,000 | Not Implemented |
MA0446 # 10 Y:1999 | 10 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $638 | $300 | Implemented |
CO0453 # 01 Y:1999 | 01 | 1999 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,250 | $1,380 | Not Implemented |
CO0453 # 02 Y:1999 | 02 | 1999 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $5,130 | $10,000 | Not Implemented |
CO0453 # 03 Y:1999 | 03 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,380 | $2,150 | Not Implemented |
CO0453 # 04 Y:1999 | 04 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $800 | $240 | Not Implemented |
CO0453 # 05 Y:1999 | 05 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $670 | $320 | Not Implemented |