IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

194

matching recommendations
Reset
SIC 381 Search And Navigation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0408 # 04 Y:2007 04 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $491 $700 Not Implemented
UU0088 # 01 Y:2005 01 2005 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $51,720 $68,760 Not Implemented
UU0088 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $703 $6,400 Not Implemented
UU0088 # 03 Y:2005 03 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,915 $900 Not Implemented
UU0088 # 04 Y:2005 04 2005 RECOVER WASTE HEAT FROM EQUIPMENT $17,670 $19,930 Not Implemented
UU0088 # 05 Y:2005 05 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,940 $30,000 Not Implemented
UU0088 # 06 Y:2005 06 2005 OPTIMIZE PLANT POWER FACTOR $15,260 $13,990 Not Implemented
CO0517 # 01 Y:2002 01 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $26,170 $55,600 n/a
CO0517 # 02 Y:2002 02 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,900 $5,000 Not Implemented
CO0517 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,640 $800 Implemented
CO0517 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,290 $2,740 Implemented
UF0307 # 01 Y:2002 01 2002 INSTALL SPECTRAL REFLECTORS / DELAMP $26,416 $12,233 Implemented
UF0307 # 02 Y:2002 02 2002 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $5,458 $8,116 Not Implemented
UF0307 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,706 $107,644 Implemented
UF0307 # 04 Y:2002 04 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $36,062 $107,250 Not Implemented
UF0307 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,754 $2,000 Not Implemented
UF0307 # 06 Y:2002 06 2002 ELIMINATE THIRD SHIFT $11,540 $0 Not Implemented
UF0307 # 07 Y:2002 07 2002 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $39,511 $50 Not Implemented
UF0307 # 08 Y:2002 08 2002 RECYCLE FLUORESCENT LAMPS $1,147 $1,895 Not Implemented
UF0307 # 09 Y:2002 09 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $37,098 $15,000 Not Implemented
SF0215 # 01 Y:2001 01 2001 APPLY A PROTECTIVE COATING TO RACKS AND TANKS $3,452 $0 Implemented
SF0215 # 02 Y:2001 02 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,984 $4,574 Implemented
SF0215 # 03 Y:2001 03 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,711 $1,366 Not Implemented
SF0215 # 04 Y:2001 04 2001 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $12,982 $13,500 Not Implemented
SF0215 # 05 Y:2001 05 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $46,103 $50,000 Implemented