IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
SIC 3822 Environmental Controls
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0387 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $44,156 $85,555 Implemented
NC0387 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,447 $100 Implemented
UD0713 # 07 Y:2005 07 2005 DEVELOP A REPAIR/REPLACE POLICY $1,021 $3,807 Implemented
UD0713 # 06 Y:2005 06 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,925 $200 Implemented
UD0713 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,435 $41,783 Implemented
CO0393 # 01 Y:1997 01 1997 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,000 $1,170 Implemented
CO0393 # 02 Y:1997 02 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,200 $240 Implemented
CO0393 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $358 $403 Implemented
CO0393 # 05 Y:1997 05 1997 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $201,090 $3,970 Implemented
CO0393 # 06 Y:1997 06 1997 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES $9,120 $10,000 Implemented
CO0393 # 07 Y:1997 07 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $400 $0 Implemented
CO0393 # 08 Y:1997 08 1997 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $113,220 $25,000 Implemented
MO0114 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $900 $1,052 Implemented
MO0064 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,227 $30,000 Implemented
MO0064 # 07 Y:1992 07 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,636 $1,195 Implemented
MO0064 # 04 Y:1992 04 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,081 $0 Implemented
MO0064 # 03 Y:1992 03 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,873 $29,500 Implemented
MO0064 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,783 $2,300 Implemented
CO0124 # 01 Y:1988 01 1988 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $834 $300 Implemented
CO0124 # 05 Y:1988 05 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $881 $969 Implemented
CO0124 # 04 Y:1988 04 1988 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,150 $1,200 Implemented
CO0124 # 03 Y:1988 03 1988 AIR CONDITION ONLY SPACE NECESSARY $1,645 $1,000 Implemented
CO0124 # 02 Y:1988 02 1988 INSTALL TIMERS AND/OR THERMOSTATS $1,162 $0 Implemented
TN0200 # 02 Y:1984 02 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,371 $0 Implemented
TN0200 # 03 Y:1984 03 1984 INSULATE BARE EQUIPMENT $189 $350 Implemented