IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
SIC 3829 Measuring & Controlling Devices, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0549 # 05 Y:2017 05 2017 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $360 $300 Implemented
SD0549 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $638 $600 Implemented
SD0549 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,048 $4,352 Implemented
SD0549 # 02 Y:2017 02 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $16,056 $3,882 Implemented
SD0549 # 01 Y:2017 01 2017 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $49,288 $204,000 Implemented
SF0441 # 02 Y:2013 02 2013 INSTALL SPECTRAL REFLECTORS / DELAMP $651 $420 Implemented
SF0441 # 01 Y:2013 01 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $27,444 $0 Implemented
SD0438 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,004 $300 Implemented
SD0438 # 05 Y:2011 05 2011 OPTIMIZE PLANT POWER FACTOR $12,712 $37,600 Implemented
SD0355 # 02 Y:2005 02 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $7,397 $0 Implemented
SD0355 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,058 $0 Implemented
SD0355 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $897 $700 Implemented
SD0228 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,410 $6,484 Implemented
SD0228 # 05 Y:1999 05 1999 PAY BILLS ON TIME TO AVOID LATE FEES $793 $0 Implemented
SF0159 # 05 Y:1999 05 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $977 $1,439 Implemented
SF0159 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,720 $0 Implemented
SF0159 # 02 Y:1999 02 1999 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,207 $1,400 Implemented
SF0159 # 04 Y:1999 04 1999 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,977 $0 Implemented
SF0159 # 09 Y:1999 09 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,339 $1,339 Implemented
SF0159 # 08 Y:1999 08 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,589 $21,750 Implemented
SF0159 # 07 Y:1999 07 1999 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,452 $2,550 Implemented
SF0159 # 06 Y:1999 06 1999 OPTIMIZE PLANT POWER FACTOR $3,156 $5,517 Implemented
SF0142 # 09 Y:1998 09 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,253 $17,610 Implemented
SF0142 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,737 $0 Implemented
SF0142 # 02 Y:1998 02 1998 INSULATE BARE EQUIPMENT $555 $349 Implemented