Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
318
matching recommendationsSIC | 384 | Medical Instruments And Supplies |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0583 # 06 Y:2022 | 06 | 2022 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $58,774 | $10,000 | Not Implemented |
UF0583 # 05 Y:2022 | 05 | 2022 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $273,973 | $0 | Not Implemented |
UF0583 # 04 Y:2022 | 04 | 2022 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $13,240 | $0 | Implemented |
UF0583 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,746 | $33,000 | Implemented |
UF0583 # 01 Y:2022 | 01 | 2022 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $308,276 | $1,243,750 | Implemented |
MI0405 # 01 Y:2022 | 01 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $51,243 | $208,000 | Implemented |
MI0405 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,714 | $39,398 | Implemented |
MI0405 # 03 Y:2022 | 03 | 2022 | USE SOLAR HEAT TO HEAT WATER | $22,766 | $62,612 | Not Implemented |
MI0405 # 04 Y:2022 | 04 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $9,041 | $580 | Not Implemented |
MI0405 # 05 Y:2022 | 05 | 2022 | INSTALL OCCUPANCY SENSORS | $3,954 | $3,600 | Implemented |
MI0405 # 06 Y:2022 | 06 | 2022 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $874 | $900 | Not Implemented |
UF0518 # 06 Y:2018 | 06 | 2018 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $109,000 | $41,200 | Implemented |
UF0518 # 05 Y:2018 | 05 | 2018 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $1,145 | $9,600 | Implemented |
UF0518 # 04 Y:2018 | 04 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,401 | $0 | Implemented |
UF0518 # 03 Y:2018 | 03 | 2018 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $3,844 | $586 | Implemented |
UF0518 # 02 Y:2018 | 02 | 2018 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $9,684 | $1,980 | Implemented |
UF0518 # 01 Y:2018 | 01 | 2018 | USE SOLAR HEAT TO MAKE ELECTRICTY | $24,028 | $167,216 | Implemented |
MI0337 # 02 Y:2018 | 02 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $41,184 | $480 | Implemented |
MI0337 # 04 Y:2018 | 04 | 2018 | INSULATE BARE EQUIPMENT | $26,104 | $3,000 | Implemented |
MI0337 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $45,349 | $76,979 | Implemented |
MI0337 # 03 Y:2018 | 03 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,197 | $11,846 | Not Implemented |
MI0337 # 05 Y:2018 | 05 | 2018 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $24,458 | $31,600 | Not Implemented |
MI0337 # 06 Y:2018 | 06 | 2018 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $21,780 | $78,320 | Not Implemented |
MI0337 # 07 Y:2018 | 07 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,813 | $2,030 | Implemented |
MI0337 # 08 Y:2018 | 08 | 2018 | INSTALL OCCUPANCY SENSORS | $14,515 | $19,215 | Implemented |