Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
SIC 3841 Surgical And Medical Instruments
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0638 # 13 Y:2023 13 2023 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $98,322 $418,100 Implemented
SD0638 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $740 $500 Implemented
SD0638 # 03 Y:2023 03 2023 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $161 $250 Implemented
SD0638 # 11 Y:2023 11 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,174 $306 Implemented
SF0565 # 02 Y:2021 02 2021 AIR CONDITION ONLY SPACE NECESSARY $35,739 $5,236 Implemented
SF0565 # 06 Y:2021 06 2021 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,819 $622 Implemented
SD0530 # 06 Y:2016 06 2016 USE PHOTOCELL CONTROLS $1,002 $2,590 Implemented
SD0530 # 05 Y:2016 05 2016 INSTALL SKYLIGHTS $1,125 $3,360 Implemented
SD0530 # 04 Y:2016 04 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,261 $861 Implemented
SD0530 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,876 $200 Implemented
SD0530 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,344 $1,500 Implemented
SD0530 # 01 Y:2016 01 2016 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $14,594 $36,400 Implemented
SF0295 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,996 $5,126 Implemented
SF0295 # 02 Y:2004 02 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,565 $7,217 Implemented
SF0295 # 01 Y:2004 01 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $2,378 $0 Implemented
SD0339 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,112 $320 Implemented
SD0339 # 03 Y:2004 03 2004 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,831 $0 Implemented
SD0325 # 02 Y:2003 02 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $71,754 $0 Implemented
SD0325 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $53,956 $32,725 Implemented
SD0325 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $37,849 $2,000 Implemented
SD0325 # 05 Y:2003 05 2003 INSTALL TIMERS AND/OR THERMOSTATS $36,071 $1,000 Implemented
SD0148 # 07 Y:1996 07 1996 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $784 $1,450 Implemented
SD0148 # 08 Y:1996 08 1996 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $640 $0 Implemented
SD0148 # 06 Y:1996 06 1996 INSTALL OCCUPANCY SENSORS $5,177 $2,429 Implemented
SD0148 # 05 Y:1996 05 1996 INSTALL SPECTRAL REFLECTORS / DELAMP $2,679 $2,670 Implemented