IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

78

matching recommendations
Reset
SIC 386 Photographic Equipment And Supplies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0119 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,002 $875 Implemented
IP0119 # 05 Y:2019 05 2019 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $27,937 $38,052 Implemented
IP0119 # 06 Y:2019 06 2019 REPLACE BOILER $20,712 $66,681 Implemented
OR0651 # 01 Y:2015 01 2015 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $58,422 $9,638 Implemented
OR0651 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $270,822 $210,050 Implemented
CO0690 # 02 Y:2014 02 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $1,180 $0 Implemented
CO0690 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $940 $370 Implemented
CO0690 # 01 Y:2014 01 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,730 $1,460 Implemented
UD0870 # 01 Y:2012 01 2012 USE PHOTOCELL CONTROLS $1,385 $1,660 Implemented
UD0870 # 06 Y:2012 06 2012 REPAIR OR REPLACE STEAM TRAPS $10,454 $1,800 Implemented
UD0870 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,610 $1,500 Implemented
UD0870 # 02 Y:2012 02 2012 UPGRADE CONTROLS ON COMPRESSORS $5,228 $10,000 Implemented
UD0870 # 05 Y:2012 05 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,199 $1,500 Implemented
UD0870 # 11 Y:2012 11 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,788 $3,000 Implemented
UD0870 # 07 Y:2012 07 2012 USE MINIMUM STEAM OPERATING PRESSURE $7,517 $0 Implemented
UD0870 # 10 Y:2012 10 2012 INSULATE BARE EQUIPMENT $1,512 $0 Implemented
WV0341 # 11 Y:2006 11 2006 DEVELOP A REPAIR/REPLACE POLICY $501 $213 Implemented
WV0341 # 08 Y:2006 08 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,253 $1,270 Implemented
WV0341 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,073 $1,800 Implemented
WV0341 # 01 Y:2006 01 2006 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $7,713 $2,370 Implemented
WV0341 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,388 $625 Implemented
WV0341 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $2,679 $543 Implemented
WV0341 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $850 $0 Implemented
OK0668 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,013 $38,456 Implemented
OK0668 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,597 $0 Implemented