IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,153

matching recommendations
Reset
SIC 39 Miscellaneous Manufacturing Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0891 # 01 Y:2024 01 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $47,100 $10,000 Implemented
AM0891 # 04 Y:2024 04 2024 OPTIMIZE PLANT POWER FACTOR $2,710 $7,275 Implemented
AM0891 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,700 $1,000 Implemented
AM0891 # 07 Y:2024 07 2024 USE PHOTOCELL CONTROLS $47 $165 Implemented
AM0891 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,490 $4,220 Implemented
MI0424 # 01 Y:2023 01 2023 INCREASE EFFICIENCY OF TRUCKS $32,721 $6,400 Implemented
MI0424 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $5,328 $0 Implemented
MI0424 # 06 Y:2023 06 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $375 $1,215 Implemented
MI0424 # 02 Y:2023 02 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,951 $120 Implemented
MI0424 # 05 Y:2023 05 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $2,147 $118 Implemented
KS2311 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,574 $6,440 Implemented
IP0164 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,649 $1,428 Implemented
IP0164 # 06 Y:2022 06 2022 RECOVER WASTE HEAT FROM EQUIPMENT $972 $1,279 Implemented
IP0164 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,851 $1,271 Implemented
IP0164 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,709 $1,228 Implemented
IP0164 # 07 Y:2022 07 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $216 $803 Implemented
MU0004 # 05 Y:2022 05 2022 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $250 $0 Implemented
MU0004 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $845 $2,773 Implemented
MU0004 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,089 $4,922 Implemented
MU0004 # 01 Y:2022 01 2022 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,123 $0 Implemented
MU0004 # 06 Y:2022 06 2022 COMBINE UTILITY METERS $180 $0 Implemented
MU0004 # 07 Y:2022 07 2022 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $58 $77 Implemented
UU0205 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,293 $198 Implemented
IP0158 # 06 Y:2022 06 2022 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,314 $467 Implemented
IP0158 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,812 $52 Implemented