IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

40

matching recommendations
Reset
SIC 39 Miscellaneous Manufacturing Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0237 # 02 Y:2024 02 2024 REDUCE VENTILATION AIR $7,109 $28,950 Implemented
UU0237 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,340 $23,500 Implemented
UU0237 # 04 Y:2024 04 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $6,350 $8,970 Implemented
UU0237 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $10,990 $184,280 Implemented
UU0237 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,430 $3,000 Implemented
UU0237 # 07 Y:2024 07 2024 PAY UTILITY BILLS ON TIME $210 $150 Implemented
UU0205 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,293 $198 Implemented
BS0034 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,549 $4,061 Implemented
BS0034 # 08 Y:2014 08 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,850 $255 Implemented
BS0034 # 06 Y:2014 06 2014 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,513 $2,503 Implemented
BS0034 # 05 Y:2014 05 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $7,083 $304 Implemented
AM0648 # 10 Y:2013 10 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,116 $9 Implemented
AM0648 # 09 Y:2013 09 2013 USE SYNTHETIC LUBRICANT $2,016 $0 Implemented
AM0648 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $52,176 $5,000 Implemented
AM0648 # 08 Y:2013 08 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,230 $500 Implemented
AM0648 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,544 $18,524 Implemented
AM0648 # 06 Y:2013 06 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,059 $167 Implemented
AM0648 # 05 Y:2013 05 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $10,304 $45,000 Implemented
AM0648 # 04 Y:2013 04 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $10,740 $0 Implemented
AM0648 # 03 Y:2013 03 2013 OPTIMIZE PLANT POWER FACTOR $16,856 $22,350 Implemented
AM0648 # 02 Y:2013 02 2013 RECYCLE WASTE INK AND CLEANUP SOLVENT $29,607 $0 Implemented
UU0070 # 02 Y:2004 02 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $95,199 $0 Implemented
UU0070 # 05 Y:2004 05 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $70,000 $18,000 Implemented
UU0070 # 04 Y:2004 04 2004 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $73,401 $750,000 Implemented
UU0065 # 04 Y:2004 04 2004 INSTALL SPECTRAL REFLECTORS / DELAMP $1,188 $225 Implemented